3 Słowacki In Ogrodzieniec. Disassembly Of Existing Co Installations And Liquidation Of Tiled Stoves (4 Pcs) And Removal Of Kitchen Stems. The Contractor Is Obliged To Restore The Premises, Supplementing The Damage Resulting With The Work With Materials Currently Available On The Market, Closest To Originally Used. 2) Central Heating Installation. - Installation Made In Copper, Steel Plate Heaters Mounted In The Kitchen And Rooms (E.G. C22 With A Side Approach), In Bathrooms, Bathroom Steel Heaters For Them Thermostatic Valves (Min. Temperature 16 Degrees C). 3) Detailed List Of Premises: • Block No. 1: Premises No. 2, Area Total 35.27 M2, M3 Premises No. 9, Area Total 45.59 M2, M3 Premises No. 12, Area Total 45.59 M2, M3 Premises No. 15, Area Total 36.08 M2, M3 Premises No. 16, Area Total 26.10 M2, M2 • Block No. 2: Premises No. 2, Area Total 35.52 M2, M3 Premises No. 6, Area Total 45.28 M2, M3 Premises No. 14, Area Total 48.85 M2, M3lokal No. 16, At Total 25.18 M2, M2 (Demolition Of Tiled Stove) • Block No. 3: Premises No. 1, Area Total 48.89 M2, M3 Premises No. 8, Area Total 34.95 M2, M3 Premises No. 11, Area Total 48.89 M2, M3 • Block No. 4: Premises No. 2, Area Total 35.79 M2, M3 Premises No. 9, Area Total 46.52 M2, M3 • Block No. 7: Premises No. 2, Area Total 34.45 M2, M2 Premises No. 5, Area Total 34.45 M2, M2 Premises No. 18, Area Total 52.53 M2, M3 • Block No. 8: Premises No. 2, Area Total 28.34 M2, M2 Premises No. 3, Area Total 47.65 M2, M3 Premises No. 7, Area Total 49.15 M2, M3 • Block No. 9: Premises No. 1, Area Total 49.70 M2, M3lokal No. 18, Area Total 47.90 M2, M3 (Demolition 2 Tiled Stoves) Premises No. 21, Area Total 49.70 M2, M3 Premises No. 26, Area Total 28.80 M2, M2 • Block No. 10: Premises No. 10, Area Total 34.52 M2, M3 Premises No. 18, Area Total 44.91 M2, M3 • Block No. 11: Premises No. 8, Area Total 34.18 M2, M3 • Block No. 12: Premises No. 5, Area Total 35.40 M2, M3 Premises No. 10, Area Total 35.40 M2, M3 Premises No. 11, Area Total 48.82 M2, M3lokal No. 15, Area Total 34.51 M2, M3 (Demolition Of Tiled Stove) 4) Delivery Of 30 Pcs. Difunct Gas Boilers With Steel Chimney Inserts (Delivery Site - Fabryka Otężeniec Sp.Z O.O. In Ogrodzieniec): • For 5 Apartments On The Ground Floor - Chimney Inserts 5 Pcs. 12Mb; • For 10 Apartments On The First Floor - Chimney Inserts 10 Length 9Mb; • For 15 Apartments On The Second Floor - Chimney Inserts 15 Pcs With A Length Of 6Mb.5) Required Boiler Parameters: • Dual -Function Boiler Without A Container; • Hanging Boiler; • With A Closed Combustion Chamber; • Name Power Of The Boiler In The Range Of 23 - 26 Kw; • Modulation Range In The Range 1: 6 - 1: 7; • Built -In Diaphragm Vessel; • Permissible Working Pressure Every Max 3 Bar; • Energy Class Min A, For ∆T = 30K; • Acute Power Level Max 52 Db; • Wireless Regulator In The Set Boiler, Stainless Steel Material; • Should Have A Magnetic Pollution Separator; • With A Thermostatic Shut -Off Valve (Radiators) At A Minimum Temperature Of
|