1. The Subject Of The Contract Is: The Reconstruction Of The Lighting Inside The Białówna 11 Building, Which Is In The Resources Of The Municipal Property Board In Bialystok. Scope Of The Subject Of The Order Electrical Industry:- Disassembly Of Existing Lighting Luminaires (Dismantled Luminaires Should Be Handed Over To The Contracting Authority),- Dismantling Of Lighting Switches (Dismantled Switches Should Be Utilized),- Bruising Furrows For Plin Cables For Lighting Switches,- Laying The Cables For Supplying Lighting Switches,- Laying Furrow, Suspended Ceiling,- Firing Of Lighting Electrical Installations,- Assembly Of New Lighting Switches,- Installation Of Led Lighting Fittings In A Suspended Ceiling (Led Panel, Flush-Mounted, 595X595 Mm 36W, 4000K, 4500 Lm, Ip44, White For Lighting The Corridor),- Installation Of Evacuation Lighting In The Ceiling In The Ceiling (Led 230Ac, At-Autotest, Ni-Cd Ht Or Ni-Cd Battery With Time Of 3H Autonomy To Indicate The Directions Of Evacuation And Marking Of Evacuation Outputs),-Assembly Of Emergency Lighting Fittings In The Suspended Ceiling (Led 230Ac, At-Atotest, At-Atotes, Ni-Cd Ht Batter Lighting Of Escape Routes),- Measurements Of Lighting And Anti-Tire Protection. 3. List Of Activities. Construction Industry: - Demolition Works In The Field Of Wall Repair - Torture Of Skirting Boards Made Of Lastrinth Mass, Dismantling Of The Fender Of The Fender Of The Walls And Protective Corners On Soils Made Of Chipboard, - Finishing Works In The Field Of Wall Repair, Wiping Surfaces, Repairing, Plastering, Repairing, Settings, Settings, Plastering, Plastering, Plastering, Plastering, Plastering, Repairing, Settings, Plastering, Plastering, Plastering, Plastering Priming, Painting With Latex Paints In The First Class Of Abrasion When Wet Scrubbing, Painting With Oil Paints,- Finishing Works Using Prefabricated Suspended Ceilings- A Ceiling On A Metal Frame With Filling Mineral Plates That Meets The Reaction Class A2-S1, D0 With Dimensions 600 X 600 Mm, The Scope Of Mounting With Hard Pvc Mounted On Mounting Glue. 4. The Detailed Determination Of The Subject Of The Contract Is Included In Annex 4 To Swz, I.E. 1) Description Of The Subject Of The Order Of The Electrical And Construction Industry (Opz), 2) Design Documentation, Which Consists Of: A) The Number Of Works, B) And Technical Specifications Of The Execution And Acceptance Of Construction Works.
|