Supply And Installation Of Plaque With Chapagalvanized And Wood Structure. Af_03/2022_Ps, Siding With Metal Tile. Af_03/2024, Entry Of Electricity, Air, Three -Phase, With Disorder Box, 10 Mm2 Cable And Din 50A Circuit Breaker (Not Included Concrete). Af_07/2020, Provisional Water And Sewage Connection, Conventional Work Lease, Using Tabled Wicked Poofing Every 2.00M - 2 Uses. Af_03/2024, 07/03/2025, Container Rental 2, 30 X 6, 00 M, Alt. 2, 50 M, With 1 Sanitario, For Office, Complete, Without Internal Partitions (Not Including/Demobilization) (Month), Without Internal Partitions And Without Sanitario (Not Inclusive/Demobilization) (Month) 4 Basins, 8 Showers, 1 Laundry And 1 Mictorio (Not Included Moderation/Demobilization) (Month), Local Type 2 Administration (Un), Mechanized Cleaning Of Vegetable Layer, Vegetation And Small Trunk Diameter Less Than 0, 20 M), With Tractors. Af_03/2024, Mechanized Hydraulic Ditch Mechanized Landfill (Bucket Capacity: 0, 8 M³/Power: 111 Hp), Width Up To2, 5 M, Depth Of 1, 5 To 3, 0 M, With Clash Soil.Af_08/2023, Manual Crowning Block Or Shoe Excavation (Including Excavation For Forming Form). Af_01/2024, Ditch Background Preparation With Width Greater Than Or Equal To 1, 5 Me Less Than 2, 5 M (Natural Soil Hit). Af_08/2020, Mechanized Backhoe With Backhoe Ditch (Retro Bucket Capacity: 0, 26 M³/Power: 88 Hp), Width 0, 8 To 1, Depth 1, With 1St Category Soil (Sessubstitution) And Depercussion Soil Compactor. Af_08/2023, Manual Excavation For Crowning Block Or Shoe (Including Excavation For Molding). Af_01/2024., 5 M (Natural Soil Hit). Af_08/2020., With Solo (Semubstitution) Of 1St Category And Compactor Of Solos Depercussion. Af_08/2023., Manual Excavation For Crowning Block Or Shoe (Including Excavation For Molding). Af_01/2024 .., 5 M (Natural Soil Hit). Af_08/2020 .., With Solo (Semubstitution) Of 1St Category And Compactor Of Solos Depercussion. Af_08/2023 .., Skinny Concrete Ballast, Applied In Decoration Blocks Or Shoes, 5 Cm Thickness. Af_01/2024, Manufacture, Mounting And Disassembly Of Block For Block Crown, In Sawn Wood, E = 25 Mm, 4 Uses.Af_01/2024, Isolated Shoe Frame, Baldrame Beam And Roaring Shoe Of 6, 3 Mm - Assembly Steel. Af_01/2024, Baldrame Beam And Shoe Running By 8 Mm Ca -50 Steel - Assembly. Af_01/2024, Baldrame Beam And Shoe Running By 10 Mm Ca -50 Steel - Assembly. Af_01/2024, Block Frame, Isolated Shoe, Baldrame Beam And Shoeworm Using 12, 5 Mm Ca -50 Steel - Assembly. Af_01/2024, Frame Of Various Reinforced Concrete Structures, Except Beams, Pillars, Slabs And Foundations, Using Ca -60De Steel 5, 0 Mm - Assembly. Af_06/2022, Shoe Concreting, Fck 30 Mpa, With Use Of Bombing, Thickening And Finishing. Af_01/2024, 5 Cm Thickness. Af_01/2024., Applied To Decoration Blocks Or Shoes. Af_01/2024, 4 Uses.Af_01/2024., Baldrame Beam And Shoe Running By 8 Mm Ca -50 Steel - Assembly. Af_01/2024., Baldrame Beam And Shoe Running By 10 Mm Ca -50 Steel - Assembly. Af_01/2024., 5 Mm - Assembly. Af_01/2024., Block Frame Using 5 Mm Ca -60 Steel - Assembly.Af_01/2024, Concreting Of Crowning Block Or Baldrame Beam, Fck30 Mpa, With Pump Use - Lanç
|