Cabints - Delivery Of Office And Cabinet Equipment - Proceedings No. 11/D. 1. The Subject Of The Order Is The Supply Of Office And Cabinet Equipment: 1) Desk, In The Amount Of 10 Pcs; 2) Computer Desk, In The Amount Of 200 Pcs; 3) Wooden Container 3 Drawer, In The Amount Of 210 Pcs; 4) The Basis For A Metal Computer Station, In The Amount Of 200 Pcs; 5) Wooden Shelf (Site), 35 Pcs; 6) 2 -Door Clothing Wardrobe, In The Amount Of 200 Pcs; 7) Desk, In The Amount Of 1 Pc; 8) Desk, In The Amount Of 3 Pcs; 9) 3 Drawer Container, 3 Pcs; 10) The Basis For A Metal Computer Station, In The Amount Of 3 Pcs; 11) Cabinet Table, In An Amount Of 1 Pc; 12) Cabinet Table In An Amount Of 2 Pcs; 13) Cabinet Bench, In The Amount Of 2 Pcs; 14) 1 Door Clothing Cabinet, In The Amount Of 2 Pcs; 15) 2 -Door Clothing Cabinet Wardrobe, In The Amount Of 2 Pcs; 16) Office Cabinet Wardrobe, In The Amount Of 1 Pc; 17) Wardrobe With Sliding Doors, In The Amount Of 3 Pcs; 18) 2 -Door Cabinet, In The Amount Of 1 Item; 19) 2 -Door Cabinet, In An Amount Of 1 Pc; 20) Cabinet Chest Of Drawers With Drawers, In An Amount Of 1 Pc; 21) Cabinet Chest Of Drawers With Drawers, In An Amount Of 1 Pc; 22) 3 -Door Cabinet, In The Amount Of 1 Item; 23) Cabinet Rack, In An Amount Of 1 Pc; 24) Cabinet Rack Of The Site, In The Amount Of 3 Pcs; 25) Standing Clothes Hanger - Wooden, In An Amount Of 1 Pc. The Subject Of The Contract Is Described In Detail In Annex 2 To Swz. 2. A City Of The Implementation Of The Subject Of The Contract: • Magazine Of The District Infrastructure Board In Olsztyn, Ul. Saperska 1; • 21 Wog In Elbląg, Soy In Elbląg, Ul. Królewiecka 169; • 22 Wog In Olsztyn, Ssi In Olsztyn, Ul. Dąbrowskiego 2; • 22 Wog In Olsztyn, Soy In Lidzbark Warmiński, Ul. Przystaniowa 1; • 24 Wog In Giżycko, Soy In Bemowo Piski, Ul. Kętrzyńskiego 1; • 24 Wog In Giżycko, Soy In Giżycko, Ul. May 1, 11; • 24 Wog Giżycko, Soy In Orzysz, Ul. Wojska Polskiego 33; • 25 Wog In Bialystok, Soy In Bialystok, Ul. Cavalry 70; 3. The Contractor Will Guarantee The Products Delivered For The Period: Minimum 24 - Maximum 36 Months From The Date Of Delivery; 4. The Required Date Of The Contract With Obtaining A Material Effect: 60 Days From The Date Of Signing The Contract.
|