The Subject Of The Contract Are Construction Works Covering The Implementation Of A Ventilation Installation In Podbaseń And In Pool Cloakrooms Together With The Assembly Of Ventilation Units (Stage I), In Particular: 1. Sanitary Installation Works According To Project: Dismantling Of The Existing Ventilation Installation In Podbaseń, Execution Of 2 New Intakes And Launchers, Execution Of A New Ventilation Installation In Podbaseń, Technical And Warehouse Rooms As Well As Swimming Pool Cloakrooms, Installation Of 2 New Ventilation Units With Automation, Headquarters N1w1 And N2w2, Wt1 Exhaust Fans, Wt2, Building Fire Flaps, Connection Of The Channels Of The New Installation In Podbaseń With Old Channels In The Swimming Pool Hall, Implementation Of A New Water Supply Installation Of Ventilation Heater, Start -Up And Adjustment Of The Ventilation System, Wire Insulation. 2. Construction Works Underground Floor According To Project: Liquidation Of An Old Intake And Launcher, Preparation Of The Mounting Hole And Assembly Of A New Wall Intake, Dismantling Of Wall Tiles, Forging Loose And Laying A New Plaster On The Walls, Ceiling And Poles And A Swimming Pool, Execution Of The Partition Wall Rei6o, Replacement Of A Steel Door Joinery With Widening Of The Hole, Installation Of The Eis3o Aluminum Door Joinery, Painting Walls And Ceiling Hydrophobic Paint, Painting The Pool Basin And Wall Oil Paint, Replacement Of Window Joinery On Ei60, - Swimming Pool Hall Export And Utilization Of Demolition Materials. 3. Electric Works In Podbaseń According To Project: Disassembly Works Of The Existing Electrical Installation, Replacement Of The Power Supply Of The Rp-1 Switchgear, Replacement Of The Rp-1 Electric Switchgear With New Equipment, Forging Furrows, Furrow Seasoning, Painting, Conducting P/T Cables, Cable Wires N/T, Sealing Cable Passages, Installation Installation, Emergency, Installation Of Plug Sockets, Force Installation, Installation Of Expansion Joints, Grounding Installation, Anti -Revasion Installation, Anti -Tire Installation, Execution Of Electrical Measures Of As -Built Electrical Measurements, Execution Of Lighting Measurements, 4. Development Of As -Built Documentation. Note: Stage I (Does Not Include Work In The Pool Hall - Except For The Window Replacement And Connection Of The New And Old Ventilation Installation) The Contractor Will Perform All Construction Works, Deliveries And Other Activities In Accordance With The Purpose Of The Investment, A Description Of The Subject Of The Contract Contained In Swz, As Well As With The Design Documentation And Other Decisions To The Extent Necessary For Full Implementation And Receipt Of The Investment - Listed By The Ordering Documents - Listed By The Ordering Documents They Are Included In Annex 9 To Swz.
|