Railway Construction Works - Career Maintenance And Renovation Activities. Ensuring Open Access To Track Maintenance And Renovation Activities On The Open -Access Railway Networks Operated By Máv Grounds Ltd. Tv. Pursuant To Article 11 (8)-(9), The Responsibility Of The Infrastructure Operator Is The Conditions Specified In The Conditions Specified In The Application For The Operation, Maintenance And Renovation Of The Railway Infrastructure It Operates, Including Its Maintenance And Renovation, Or In The Subsidy Contract Or The Financing Of The Development. In Connection With The Operation Of The Infrastructure, The Máv Subjection Co. Ltd. Is Required To Carry Out The Construction Of Various Types Of Construction Work And Other Activities In Connection With Railway Track Maintenance, Renovation And Track Construction In Order To Maintain And Develop Railway Transport Security. Repair Of Bottom In Track: • L And Lx World Vb. Repair Of Bottom In Track: • L And Lx World Vb. Repair Of The Bottom On The Work Bench: • E, B, U, Tu, And Tf Vb. Improve Bottom In The Track: • Fallow And Detour Replacement With Fellow Delivery/Detour Delivery, Used Materials • Size Of Sleepers And Detour Trees: • 2.60 Mh Sole Change • 2.60 Mh Detour In Replacement • 2.80 Mh Detour In Detour • 3.00 Mh Detour Detour • 3.40 Mh Detour Replacement In Detour • 3.60 Mh Detour Swap In Detour • 3.80 Mh Deturant In Replacement • 4.00 Mh Detour Swap In Detour • 4.20 Mh Detour In Detour Detour • Fallow And Detour Replacement Without Transportation Of Sleeper/Detour Tree • Size Of Sole And Detour Trees: • 2.60 Mh Sole Change • 2.60 Mh Detour Swap In Detour • 2.80 Mh Detachment Tree Replacement • 3.00 Mh Detour Swap. Mh Detour Swap In Detour • 3.60 Mh Deturant Tree Replacement • 3.80 Mh Detour Swap In Detour • 4.00 Mh Detour In Detail • 4.20 Mh Detour In Detour • 4.40 Mh Detour Swap In Detour • 5,20 Mh Detour Founded Vb. Bottom: • Lm (Lm-S, Li…) World Championship. Bottle Replacement: • Lm (Lm-S, Li) Vb. Bottom Replacement In Tunnel: • Switch Replacement For Flexible Rails • Switch Replacement Geo Switch Replacement For Geo Reinforcement: • Geo Washer Replacement: • Screw Secretion Ring Replacement: • Remove The Rails/Long Rails: • Long Rails Removed: • Tsh Rail Arrangement In Longitudinal, Connecting Rails) • Rail End Rejuvenation The Main Elements Of The Work To Be Done During The Execution Are Determined In Detail By The Technical Description And Other Related Professional Requirements And Instructions. Or
Contact Information
Contact No.
+36 300827916
Email
lokos.eleonora.maria@mavcsoport.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 93575629
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.