Extension New Building Rainbow School Elliehausen Harrenacker 1/37079 Göttingen Earthwork 1,000 M3, Paving Ceilings 325 M2, Lawn Layer 20 M2, Brewing Strip Basal Spotty 9.60 M3, Gravel Application Layer D = 30 Cm 345.00 M2, Edge Border Concrete Bracket Tb 8/25 Cm 167 M, Asphalt Road 200 M2, Double Bar Grid Fence H = 2.0 M 166.00 M, Angular Support Elements 22 Hours 50/50/60-80Cm 5.50T, Staircase From Concrete Block Stages Stg.15/33 Cm 46 M, Bike Roofing 1 St, Trench Work 280 M3, Rainwater Pipes Dn/Od 160 210 M, Rainwater Shafts 9.00 St, Drainage Channels Nw 150 3.50M, Facade Channels Nw 200 74M, Cleaning Zone Steel Construction, Cisterns 615 M³ 3 Hours, Ventilation Tube In The Ground Dn 1000 10 M, Digging Work Empty Pipes 133 M3, Install The Top Floor 250 M3, Vegetation Areas From. 2,000 M2, Small Trees 180 St, Perennial 1,200 St, Climbing Plants 85.00 St, Lawn 1,446 M2, Flower Meadow 200 M2, Construction Site Furnishings. 1 St, Bodenentsorg. 2,300 T.
|