Electrical Installation Work - Red Mt Automation In The Muntenia Nord Area, In Order To Identify And Isolate The Defective Network Area. An Execution Contract Will Be Concluded (With Dde And As Built Phases) Execution Contract) For, Red Mt Automation In The Muntenia Nord Area, In Order To Identify And Isolate The Defective Network Area Contracting Entity, Electricity Distribution Romania S.A. (Deer S.A.) Has As Main Activity The Distribution Of Electricity, As Well As The Operation, Modernization And Re -Technologicalization Of Existing Energy Installations, In Correlation With The Production And Transport Systems Based On Licenses According To The Law. The Contracting Entity Deer Sa Has 18 Regional Structures Organized In 3 Distribution Areas: - Transilvania Nord Area Which Includes The Regional Entities: Cluj, Oradea, Baia Mare, Satu Mare, Bistrita And Zalau; - Transilvania Sud Area That Includes The Regional Entities: Brasov, Sibiu, Alba, Harghita, Covasna, Mures; - Muntenia Nord Area That Includes The Regional Entities: Ploiesti, Galati, Braila, Buzau, Targoviste, Focsani. At This Work, Works Will Be Carried Out To Modernize The Switching Equipment From The Medium Voltage Network And Mounting Of New Equipment In Transformation Positions, Respectively The Integration Of The Existing Scada System, From The Counties: Prahova, Galati, Braila, Dambovita, Buzau And Vrancea County. The Work Was Structured In Two Components, As Follows: A) The Component C1- Modernization Of The Switching Equipment From The Medium Voltage Network Modernization Of The Switching Equipment In The Medium Voltage Network Implies:- Mounting A Number Of 101 Removal Reanacans; 721 To A Number Of Remote -Controlled Separators; 961 Medium -Voltage Voltage Cells; 229 Own Service Paintings; 232 Telecommunications Cabinets In Pt Or Pa B) Component C2 Digitalization Of The Medium Voltage Network In This Component Includes The Necessary Equipment For Digitization, As Well As The Integration Works Of The Equipment In The Existing Scada-Sad System. - Installation Of 1054 Scada Equipment Assemblies And Their Integration Into The Existing Scada/Dms Of Each Branch; The Estimated Value Was Determined Taking Into Account The Following Chapters And Subchapters Of The Approved General Quotation, According To The Need For The Service. Monitoring Investments No. Deer - 23303 / 29.01.2025, Regarding The Expenses Necessary To Carry Out The Work Red Mt Automation In The Muntenia Nord Area, In Order To Identify And Isolate The Defective Network Area, Made According To Gd 907/2016, With The Subsequent Modifications And Completions, As Follows: The Estimated Value: 203.765.520.77 Lei Without Vat No. Crt. Chapter / Sub -Chapter Value Expenses (Lei Without Vat) 3.5.6.2 Execution Details And As Built 501.766.40 4.1 Construction And Installations: 51.422.524.55 4.2 Mounting Equipment, Technological And Functional Equipment: 13,920,529.82 4.3 Equipment, Technological And Functional Equipment That Requires 137.700.700.700 6.1 Preparation Of Operating Personnel: 252,000,00 The Execution Time Is 40 Months From Da
|