Tenders Are Invited For Works For Complete Or Part Construction And Civil Engineering Work - Execution Of Co ... in Poland
Tender Notice
TenderID
93518410
Tender Brief
Tenders Are Invited For Works For Complete Or Part Construction And Civil Engineering Work - Execution Of Construction And Assembly Works For The Task Reconstruction Of The Gąbin - Gąbin 1 And Gąbin - Gąbin 2
Works For Complete Or Part Construction And Civil Engineering Work - Execution Of Construction And Assembly Works For The Task Reconstruction Of The Gąbin - Gąbin 1 And Gąbin - Gąbin 2. The Subject Of The Contract Is The Execution Of Construction And Assembly Works For The Task: Reconstruction Of The Sn Gąbin - Gąbin 1 And Gąbin - Gąbin 2 Line. This Task Concerns The Dismantling Of A Part Of The Overhead Line With A Voltage Of 15 Kv: Gostynin Gąbin Ii Line Number [0020/24], Dismantling Of Sn/Nn Transformer Stations And Nn 0.4Kv Line Sections And Construction Line Sn 15 Kv Cable Line (Na2xs Cables (Fl) 2Y 1X240/50 Mm2, Na2xs (Fl) 2Y 1X240/25 Mm2, Na2xs (Fl) 2Y 1X150/25 Mm2), Construction Of 15 Kv Cable Connectors Of The Medium Voltage Chapter Construction Of The Containt Control. Cable From The Stations Being Built. The Scope Of The Implementation Of The Task Is Included In Three Project Documentation Constituting The Whole Task. The Scope Of Works Includes: • Stage I From Gpz To T7400969: - Construction Of The Sn Cable Line - 7 020 M, - Installation Of A Remote -Controlled Overhead Disconnector With Replacement Of The Column, - Sn Cable Cable Connector Building With 4 Field Scs, - Reconstruction Of The Sn/Nn Station For Container Stations With External Service, Including: 1) Field Sn - 4 Pcs., 2) With A 5 -Field Sn Switchgear With Teleborating - 2 Pcs, 3) With A Switchgear Of 5 Field Sn - 2 Pcs., 4) With A 4 -Field Sn Switchgear With Telebalning - 1 Pcs., 5) With A 6 -Field Sn Switchgear With Tele -Screen - 1 Item, - Replacement Of The Sn/Nn Overhead Station Słunej Nn - 7 Pcs, - Construction Of A Nn Cable Line With A Length Of 2,146 M, - A Pillar Building Of The Fuse Disconnector - 8 Pcs, - Dismantling Of Cable And Overhead Lines; • Stage Ii From The T740969 To T741134 With The Connection With Lsn Gąbin 1 T74-0528 A Lsn Gąbin 2 T740789: - Sn Spr Post - 2 Pcs, - Construction Of A Sn Cable Line With A Length Of 2,821 M, - Construction Of A Sn Cable Line With A Length Of 988 M, - Construction Of A Sn Cabin Line With A Length Of 700 M, - Sn Cable Cable Connector Buildings With 5 Separate Sn, - Reconstruction Of The Sn/Nn Station For Container Stations With External Support, Including: 1) With A 5 -Field Sn Switchgear With Tele -Screen - 1 Pc., 2) With A 4 -Half Sn Switchgear - 3 Pcs., 3) With A 6 Field Sns Switchboy - 1 Pcs. 7 Pcs • Stage Iii Lsn Gąbin 2 From T741134 To Gpz With The Lsn Gąbin 1 T740524 A Lsn Reconstruction Of The Sn/Nn Station For Container Stations With External Support, Including: 1) With A 5 -Field Switchboard Sn - 2 Pcs., 2) With 4 Field Sn Switchgear - 1 Item
Contact Information
Contact No.
+48 726 800 237
Email
iga.gorczyca@energa.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 93518410
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.