The Subject Of The Contract Is The Implementation Of The Task Entitled: Ordering Water And Sewage Management In The Commune Of Nieborów- Stage I Which Includes: 1. Comprehensive Modernization Of The Water Treatment Station In Bełchów Includes Works In The Field Of:- General Construction Works At Water Treatment Stations,- Work In The Field Of Wiring And Electrical Installations,- Expanding The Foundations In The Technological Hall,- Door Extension,- Door Extension, Input To The Technology Hall In The Peak Wall,- Construction Of A Foundation Slab For Power Generator And Assembly Of The Aggregate,- Replacement Of Fast Pressure Filters With Pipelines And Fittings,- Execution Of Photovoltaic Installation. For Devices Adopted In The Design, Equivalent Devices Are Allowed. The Condition Is To Ensure At Least The Same Performance And Quality Parameters And The Standard Of Performance. Note: During The Modernization Of The Water Treatment Station, The Contractor Will Ensure Continuity In The Supply Of Water That Meets The Water Norms For Consumption. Automatic Control Should Be Used To The Water Treatment Technology Described In The Water Treatment Technology. It Should Be Assumed That The Filters Will Work In The Automatic Cycle, Which Makes It Necessary To Equip Them With Throttle Sets And With The Appropriate Aeration Blower And Rinsing Pump. The Entire Filter Set Devices Will Be Controlled By Means Of An Electronic Plc Microprocessor System. The System Will Control Water Levels In Tanks, Levels Of Water Mirror In Wells, Devices Operating States, Water Flows From The Well, Flushing Water Flows, Compressed Air Pressure For Control, Water Flow To The Recipient Of Theutomatic Will Perform Periodic Flushing Of The Deposit With Treated Water Taken From The Warehouse Of The Warehouse Of Versed Water Using Compressed Air From The Blower. Regeneration Will Take Place Automatically After One Of The Three Conditions, I.E. :- After The Filter Was Produced By The Set Water Volume (Each Has A Flow Meter),- After Exceeding The Set Working Time,- After Manual Initiation. Corporation By Using The Plc Controller And Appropriate Equipment Of The Devices Used (Checking The Reaction Time Of The Switch Switches On The Overweight System. In Emergency Cases, A List Of Alarm Is Displayed On The Operator Panel And An External Alarm Is Activated. The Automatic Versions Used In The Automatic Version Are Equipped With:- Pneumatic Cylinders,- Control Solenoid Valves,- Status Regulators,- State Indicators With Electrical Confirmation Of The State,- Have The Ability To Manually Change The State Using A Lever Or Compressed Air To The Above Range, Technical Documentation And Electrical Designs And Akpia. 2. Construction Of A Drinking Water Reservoir On A Foundation Plate With Technological Installations. The Zrp 3 Retention Reservoir (Total Capacity Of The Reservoir 114.0 M³) Is Designed, Vertical Steel, Will Be Placed On The Reinforced Concrete Foundation Plate. The Order Of The Ord
Contact Information
Address
Gmina Nieborów,Nieborów,99-416,Łódzkie,Pl715 - Skierniewicki
Email
gmina@nieborow.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 93516393
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.