Quotation are invited for Supply & Installation of 2.5 TR Split AC Units. SUPPLY & INSTALLATION OF 2.5TR SPLIT AC UNITS FOR CRITICAL ROOMS INM-STATION COVERING AIR COMPRESSOR BUILDING LER (2 NOS), DEMIN PLA NT LER(2 NOS), DFO LER (2 NOS), WWTP LER/MCC (3 NOS), COMMON EDG (1 NO.),BLOCK-10 EDG LER(1 NO.), BLOCK-20 EDG LER(1 NO.) AND BLOCK -30 EDG LER(1NO.)(TOTAL: 13 UNITS)MAKE: O-GENERAL/ MITSUBISHI/ WHITE WESTING HOUSE/ SKM.ELECTRICAL SUPPLY: 220VAC 50HZRATING: 2.5TR AT 50 DEG.C AMBIENT CONDITION (MANDATORY).REFRIGERANT: HFC.SCOPE OF WORK:1) ALL THE REFRIGERANT PIPING SHALL BE INSULATED AND LAID I N GI TRUNKINGFOR OUTDOOR AREA AND PVC TRUNKING FOR INDOOR AREA.2) CONTROL CABLING FROM INDOOR TO OUTDOOR UNIT SHALL BE LAID IN GICON DUIT.3) ELECTRICAL POWER SUPPLY SHALL BE TAKEN FROM THE NEAREST DISTRIBUTIONPANEL.4) POWER CABLE FROM DISTRIBUTION PANEL TO LOCAL IS OLATOR AND FROMISOLATOR TO THE OUTDOOR UNIT SHALL BE LAID IN GI CONDUIT .5) PVC DRAIN SHALL BE INSULATED & FOSTERED, AND TO BE ROUTE D TO THENEAREST DRAIN POINT.6) OUTDOOR UNIT SHALL BE MOUNTED ON GI FRAME/ CONCRETE FOUNDATION. THEFRAME SHALL BE PAINTED WITH ANTI-C ORROSIVE PAINT/ CONCRETE BLOCK SHALLBE PLASTERED AND PAINTED.7) CORE DRILLING SHALL BE DONE AT ALL WALL CROSSINGS FOR ROUTING THEREF RIGERANT & DRAIN LINES AND CABLES. ALL SUCH OPENINGS SHALL BE SEALEDPROPERLY.8) IDENTIFICATION TAGS SHALL BE INSTALLED FOR THE INDOO R & OUTDOOR ACUNITS, ALL CABLES AND TRUNK/CONDUITS.9) EARTHING SHALL BE DONE CONTINUOUSLY AT ALL JOINTS OF CONDUIT/TRUNKS.OUTDOOR A/ C UNITS SHALL BE EARTHED PROPERLY.10) TESTING & COMMISSIONING OF THE UNITS SHALL BE COMPLETED BEFORE MAY2025.11) THE FOLLOWING DOCUM ENTS SHALL BE SUBMITTED AT THE TIME OF DELIVERY:A)CERTIFICATE OF WARRANTY FOR 1 YEAR FOR THE A/C UNITS AND FOR 5 YEARSFOR THE COMPRE SSORS.B)O&M MANUAL AND CONTROL CIRCUIT DRAWINGS OF THE UNITS.12)CONTRACTOR SHALL VISIT DEWA M-STATION SITE, TO FAMILIARIZE WITH SITE LAYOUT AND REQUIREMENTS, BEFORE QUOTING. FOR ANY CLARIFICATION, PLEASECONTACT MR. MUMTAZ (04-3225864/ 055-6471260). EMAIL:MUMTAZ.ABR O@DEWA.GOV.AE Qty: 13 Supply & Installation of 2.5 TR Split AC units - for any clarification, please contact Mr. Mumtaz (04-3225864/ 055-6471260). Email: Mumtaz.abro@dewa.gov.ae STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2492500098)/$value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 93467435
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.