Construction Work - 25E0045 (Lbb Nl Mainz) University Medical Center At Joh. Gutenberg University Mainz / Neubau Born 308D Hi -Tron - Facade. Description Of The Type And Scope Of The Services The University Medicine Of The Johannes Gutenberg University Mainz Plans To Build A Research And Laboratory Building For The Helmholtz Institute For Translational Oncology And Cancer Memune Therapy On Its Southwestern Site. The New Hi-Tron Building Is The Keystone Of The Already Completed Series Of Modular Buildings (Pkzi/Kti) On Kilian Weg, In The Southwest Of The University Medical Center Mainz. The Building Consists Of A Rectangular Solid Building With Basement, Ground Floor, 4 Upper Floors And A Technology Center On The Attic (5Th Upper Floor). In The Floors 1-4, The New Building Is Connected To The Inventory With A Closed, Glazed Bridge Structure. The Facade Consists Of A Hole Facade With Single Windows And Isolated Pr Facades In The Entrance And Bridge Area. The Cover Is Insulated With A Wdvs System. The Technology Centers Are Located In The Ug And In The Og 5 As The Attic As Well As In An Outside, Freely Weathered Technology Courtyard. Dimensions Approx. 22 X 26 M; Bgf Approx. 4,400 M2; Size Construction Site Approx. 2,000 M2 Description Of The Construction Measures Ve 110.2 Pr Facade / Windows / Doors Cpv Codes: 45441000-0 Glibution Work 45443000-4 Facade Work 45212190-1 Construction Work For Steel Constructions 4526262670-8 Metal Coole Work 45452000-0 Facade Cleaning Work Facade Work/Glazing Work/Fitting Work: Approx. 360 M² Post-Bar Facade Made Of Aluminum Profiles With Press Strip, In Partial Areas, Bridge Approx. 20 M² Post-Bar Facade Entrance Area Approx. 22 M² Post-Bar Facade Windfang Approx. 34 M² Sheet Metal Cladding Ceiling Underview Bridge Metal Construction Work/Glazing Work/Fitting Work: Approx. 3 Hours Of Lamella Weather Grilles Alu, Approx. 4 M² Each, Divided Version Approx. 1 Hour Of Lamella Weather Grilles Aluminum, Approx. 3.7 M² Approx. 4 Hours Of Lamella Weather Grilles, Each Approx. 3 M² Approx. 2 Hours Of Lamella Weather Grilles Aluminum, Approx. 1.5 And 1.7 M² Approx. 136 St Shooting Window Including Glazing, Fittings, Weather Benches Approx. 1 St Window Fixed Including Glazing, Weather Bench Approx. 1 St Aluminum Tube Frame Door, 2-Flg, Filling Glass-Outer Door Approx. 1 St Aluminum Tube Frame Door, 2-Flg, Filling Glass-Windscreen Approx. 2 Hours Aluminum Pipe Frame Door, 1-Flying, Filling Glass-Outer Door Approx. 5 Hours Of Steel Stainless Door, 1-Flg, Isolated- Outside Door Approx. 2 Hours Of Sheet Steel Door, 2-Flg, Isolated-Outer Door Approx. 18 St Aluminum Tube Frame Door, 1-Flg, Filling Glass-Interior Door Approx. 15 St Aluminum Pipe Frame Door, 2-Flg, Filling Glass-Interior Door Construction Work For Steel Structures: Approx. 17 T Steel Tonnage Substructures Pr Facade, Perforated Windows, Doors And Weather Protection Slats Sun And Glare Protection: Approx. 130 Hours Of Lamellae Offshore External (Engine) Facade Cleaning Work: Approx. 450 M² Hole Window (137 Hours) Including Window Sills On The Outside Approx. 450 M² Outside Sun Protection Made Of Slat Gate Approx. 360 M² Pr Facade Bridge Approx. 20 M² Pr Facade Entrance Area Approx. 22 M² Pr Facade Wi
|