Quotation Are Invited For Lps For E-Station Mmd Desal. To Carryout High-Pressure Hydro-Jet Cleaning Of Tubes From Stage # 1To16 And Brine Heater At E-Station Desal-2.#Stage No. To Be Clea Ned: 1 - 16 (Total Stages: 16) And Brine Heatertotal No. Of Tubes To Be Cleaned In Each Stage And Brine Heater = 2780Nos.#Specif Ications & Details Of Tubesstage# 1 # 16 & Brine Heatertotal Stages 17 Nos.No. Of Tubes /Stage 2780 Nostube External Dia. 31.75 Mmtube Wall Thickness 1.2 Mm Tube Material Cu Ni 90/10Length Of Tubes Stage 1 To 16 18.286 Mmlength Of Tubes Brine He Ater 16.583 Mm#Scope Of Work:1)#Internal Surface Of The Tubes To Be Cleaned At Approx. 1000 Barpressure.2)#Diesel Fuel Fo R The High-Pressure Pumps Is In Scope Of Contractor.3)#Dewa Will Provide Scaffolding, Forklift And Cranes Required For Thejob.4)#Pow Er And Water Supply At A Central Point Will Be Provided By Dewafree Of Cost. Contractor Shall Arrange To Extend The Facility To Thel Ocation Where It Is Required; However, Contractor Will Arrangenecessary Equipment/Fittings Like Electrical Switches, Cables, Etc.5)# 24 Volt Transformer, Cables And Bulbs To Be Arranged By Contractor.6)#The Contractor Shall Complete The Work On Time (15 Days)7)#The Safety Of The Staff Involved Is The Responsibility Of Thecontractor. All Ppe & Safety Harness Required For His Staff To Bearranged By Contractor.8)#All Equipment And Tools Required For The Job Is In Scope Ofcontractor.9)#Disposal Of The Waste From The Site After Completion Of Work Is Theresponsibility Of Contractor.Note:1)#The Contractor Shall Visit The Site And Make Himself Fully Familiarwit H The Work Scope, Plant Access, Facilities, Complexities, Etc.,Before Submitting His Bid. Dewa Will Not Accept Any Claim For Extrasb Eyond The Order Rate/Price During And After The Execution Of Work.2)#The Contractor Should Obtain A Permit In The Prescribed Dewa Fo Rmatfor Extended Hours Or Holidays For Work.3)#Contractor Will Obtain Permission To Work (Ptw) Prior Tomobilization/ Commencement Of Work.4)#Contractors Might Have To Mobilize Double Work Force To Complete Thejob On Time.5)#In Case Of Any Emergencies The Contracto R Must Work Round The Clocktill Completion Of The Work.6)#It Is Also Likely That Work At Site May Have To Be Suspended Orpostponed D Ue To System Requirements. Contractor Shall Not Be Liable Forany Extra Compensation In Case Of Such Changes In The Schedules7)#For A Ny Further Clarifications, Station Maintenance Dewa Engineermr. Mehboob / Majid Can Be Contacted 0504611674 / 048044908 Qty: 1 Lps For E-Station Mmd Desal As Per Operation Brine Flow Is Reduced. Tube Cleaning Required To Unblock Or Remove Scales From Tubes To Improve Flow And Efficiency Of Unit E2. For Any Further Clarifications, Station Maintenance Dewa Engineer Mr. Mehboob / Majid Can Be Contacted 0504611674 / 048044908 Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Srm.Dewa.Gov.Ae/Sap/Opu/Odata/Sap/Zsrm_Rfx_Reg_Bid_Srv/Attachmentset(2332500544)/$Value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 93016562
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.