1. The Subject Of The Order Is The Construction Of The Amphitheater For 498 Places (Including 400 Seats) In The Spa Park Of The Gołdap Spa Along With Emergency Installations: Water Supply, Sanitary Sewage System, Rainwater Sewage, Electrical, And Land Development And Construction Of A Congress On Journal Of Laws No. Geod. 1986/6, 1981 Ob. Geode. Gołdap 1. The Spatial And Functional System Of The Amphitheater Consists Of The Following Parts: A Covered Audience With An Area Buildings 374.60M2, Scene Covered With A Building Building With A Scene With An Area Of Buildings 355.10 M2 And A Volume Of 672.00 M3, Observation Deck And Communication Service (Exit, Internal Road, Fire Road, Paths, Pavements, Access And Commuting). The Scope Of The Order Includes, In Particular:- Removal Of Trees Colliding With The Investment,- Demolition Works Of The Surfaces Of Paths And Pavements,- Disassembly And Shift Of Existing Lighting Lamps,- Earthworks And Terrain,- Construction Of The Building Of The Amphitheater Facilities With The Stage,- Construction Of Covered Audience,-- Construction Of A Covered Garbage Dump,- Construction Of A Congress, Fire Road, Paths And Pavements,- Construction Of Hardened Concrete Cube Surfaces (Roads, Parking Spaces, Sidewalks, Stairs, Driveways And Ramps),- Construction Of A Ground External Sanitary Sewage System,- Construction Of A Point Of Mind External Storm Water Drainage Installation,- Construction Of Rear External Electrical And Electricity Installation,- Construction Of An External Eternal Telecommunications Installation,- Construction Of A Sanitary Sewage Connection,- Construction Of A Rainwater Sewage Connection,- Construction Of A Water Supply Connection,- Construction Of A Power Connection. As Part Of The Subject Of The Order, A Tree Felling Is Planned. Implementation Of The Felling In Accordance With The Biś.613.60.2024 Decision Issued And Attached To The Construction Project 29.10.2024 - Except For The Breeding Season. Performance Of Ornithological Expertise And Ensuring Ornithological Supervision In Order To Implement The Cutting In The Breeding Season - On The Side Of The Contractor. The Concise Description Of The Subject Of The Contract Was Specified In The Project Documentation Constituting Annex No. 12 - 18 And 24 - 28, Specification Of Technical Execution And Receipt Of Construction Works (Stwiorb) Constituting Attachments No. 19 - 23 To Swz. In Addition, Annexes No. 12A And 12B To Swz Are:- Decision No. Mg.83.2024 Of 29.11.2024- Building Permit- A Designer Statement On Introduced Changes In Relation To Design Solutions. The Minimal Period Of Quality Guarantee For Completed Construction Works- 36 Months Attention ! The Warranty Period Is A Criterion For Assessing Offers. As Part Of The Performance Of Construction Works, The Contractor Will Be Obliged To: A) Ensure The Geodetic Service Necessary To Perform The Contract, B) The Performance Of As -Built Inventory, C) Establishing The Construction Manager, Construction
|