Theatre Construction Work – Odense Teater - Tender Stage Machinery Systems. Introduction Most Of The Stage Machinery Systems At The Odense Teater Are Being Replaced. A Few Systems Will Be Partially Replaced And Overhauled. The Stage Machinery Consists Of Overstage And Understage Machinery Systems. In Addition, The Theatre Will Be Equipped With A New Stage Machinery Control System, Which Will Control All Stage Machinery Systems. The Following Text Does Not Contain Any Detailed Technical Information. It Is Intended To Give The Bidder An Overview Of The Scope Of The Work In Order To Spark His Interest And To Give Him The Opportunity To Assess Whether He Can Offer His Services Within The Specified Period, Taking Into Account The Scope And Complexity Of The Systems Described. Dismantling The Theaters Existing Systems Must Be Dismantled And Disposed Of. This Includes Motor Drives, Mechanical Systems, Steel Construction, Electrical Infrastructure And The Wooden Stage Floor. Stage Machinery The Overstage Machinery Systems To Be Dismantled Currently Include The Following Systems: 22X Counterweight Fly Bars 8X Powered Fly Bars 2X Powered Lighting Bars 1X Winch Drive Of The Safety Curtain The Understage Machinery Systems To Be Dismantled Currently Include The Following Systems: 6X Orchestra Pit Elevators (Scissor Lift) 1X Turntable The Associated Infrastructure Such As Wire Ropes, Pulleys, Flying Bars, As Well As The Supporting And Retaining Structures Must Also Be Dismantled. The Electrical Infrastructure, Including Cables, Cable Support Systems And Electrical Cabinets Of These Overstage And Understage Systems, Must Also Be Dismantled. Steel Work In The Stage Tower, There Is A Gallery On The Left And Right, Which Are Connected To The Fly Grid Via A Spiral Staircase. These Must Be Completely Dismantled. To Do This, The Pulley Beams, Winch Support Beams, Grid Floor, And Flooring Beams Of The Lower Fly Grid Level Must Be Dismantled. Wooden Stage Floor The Wooden Stage Floor With A Total Area Of Approx. 190 M2 Including The Flooring Sleepers Must Be Dismantled. Overstage Machinery The Followings Overstage Machinery Systems Must Be Installed: 26X Powered Fly Bar Winches Above The Orchestra Pit There Is A Powered Winch Drive Of The Forestage Fly Bar, With A Lighting Grid Made Of Steel Tubes On Its 8 Wire Ropes. The Winch Drive Works And Is Currently In Use. The Existing Winch Needs To Be Refurbished. This Winch Is Installed In A Very Narrow And Difficult To Access Cavity. As Part Of The Renovation, Better Access For Maintenance Work On The Winch Will Be Created From Above. Nevertheless, Installing A New Winch Would Be A Lot Of Work. The Existing Winch Drive Is Therefore To Be Refurbished And Integrated Into The New Stage Machinery Control System. For This, In Addition To The Axis Computer And Frequency Converter, The Encoder, Load Measurement And Limit Switch Also Need To Be Replaced. The Wire Ropes And Diverter Pulleys Also Need To Be Replaced. The Steel Grid Will Be Replaced By Two Flying Bars. Understage Machinery A New D
Contact Information
Address
Jernbanegade 21
Contact No.
66 12 00 52
Email
info@odenseteater.dk
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 92956216
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.