Tender For Creation Of 63 Kva Substation At Anderwan A- 1 Supply, Installation, testing & Commissioning of 63 KVA11/0.433kV, 3-Phase DT with Bimetallic Terminal Connectors Energy Level-2 Aluminium Wound, and with LV cable Box having detachable aluminium Gland plate 2 Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and erection of 9 Mtr. LongST Poleswith pit excavation [IS 2713 410 SP 33] 3 Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and erection of 8 Mtr. LongST Poleswith pit excavation [IS 2713 410 SP 15] 4 Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and Laying of0.05 ACSR Conductor 5 Supply,installation, testing and commissioning of Gapless Surge Arrestor, 9kV, 10KA LA with polymer housing, station type. 6 Supply,installation, testing and commissioning of11 kV Horn Gap Fuse Set 3 Phase 200A 7 Supply,installation, testing and commissioning of11kV G.O. AB Switch 3-Phase, 3-Pole 200A Vertical Type. 8 Providing and fixing of GI Channelcross-arm 75x40x40 x6mmwith GI Angle Pole Top Bracket (50x50x6 mm) including back clamps of 50X8 mm for fixing Cross arm and pole top bracket . 9 Supply,installation, testing and commissioning of11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm 10 Supply,installation, testing and commissioning of 185 mm² Single-Core Cable, 1.1kV Grade, XLPE un armoured FRLS type 11 Painting of each Pole 1 coat red oxide paint and 2 coats of aluminium paint (@ 1 ltr/pole red oxide paint and 1 ltr/pole aluminium paint) 12 Supply,installation, testing and commissioning of Galvanized Nuts and Bolts of sizes. 13 Providing and laying of Cement bottoming 1:2:4 mix as per Standards 0.40 cum per pole for ( 8 Mtr) 14 Providing and laying of Cement bottoming 1:2:4 mix as per Standards 0.48 cum per pole for ( 9 Mtr) 15 Providing & fixing of Earthing Complete by GI Pipe 40 mm 3mtr long through GI Strip 25x3 mm 16 Providing and laying of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. 17 Supply,installation, testing and commissioning of 16 KN Polymer Shackle Insulators LT 18 Supply,installation, testing and commissioning of GI Mukey for Shackle Insulator with Bolt of (50x6)mm 19 Providing & fixing of Sundry Items like Aluminium Lugs, Jumpers, Binding Tape 20 Pre and Post Geo tagged Photographic Evidence consisiting of 5x7 inch Photographs and Autocad Single Line Diagram
|