The Subject Of The Contract Is The Development Of Project Documentation For The Reconstruction Of Piekiełko, Okrętna And Krajewo Streets In Mława. 1. The Scope Of The Task Includes The Development Of 2 Separate Documentation For The Reconstruction Of Municipal Roads Of The Total Length Of Approx. 12 Km: 1) Ul. Piekiełko (231242W) And Ul. Okręcna (231240W) On The Section From Ul. Studzieniec North To The City Limits- Approx. 6 Km, 2) Ul. Krajewo (231230W) On The Section From Ul. Piekiełko To Al. Marszałkowska And North To The City Limits - About 6 Km. It Is Planned To Build A Roadway, Pavement, One -Sided Bicycle Road, Road Lighting (Cable Lighting Network Or Hybrid Lamps). Construction Of Retention Tanks With A Rainwater Sewage System, Teletechnical Network (On Needs Of Municipal Monitoring), Water Supply And Sanitary Sewage System To The Adjacent Properties. In Addition, The Documentation Developed Includes The Reconstruction, Expansion And Construction Of Intersections As Well As The Reconstruction And Construction Of Existing Exits, As Well As Reaching The Property And Internal Roads. As That The Road Lane Is Not Entirely The Property Of The City Of Mława, It Is Necessary To Make Expropriations. The Route Is Located In Part In The Ownership Of The State Forests. Therefore, The Investment In Question Should Be Carried Out In The Procedure Described In The Act On Special Rules For The Preparation And Implementation Of Investments In The Field Of Public Roads (I.E., Journal Of Laws 2024 Item 311) And Obtain A Decision To Permission To Implement A Road Investment. The Contractor Of The Documentation As Part Of The Contract Will Obtain All Necessary Opinions, Arrangements, Conditions And Draw Up All Studies Necessary To Obtain The Abovementioned Decisions. Plots Owned By The State Forests Are: Precinct 13, No. Rewid 114, 116. Plot, 13-116 To Adapt To Standards Requires Widening. It Is Not Excluded The Need To Expropriation Of Other Areas For Widening The Road Lane And For Retention Reservoirs. Division Costs Should Be Included In The General Costs Of Documentation. In The Relationship, The Planned Construction Of Retention Tanks In Accordance With Art. 389 Of The Act Of 20 July 2017 Water Law (I.E., Journal Of Laws Of 2024, Item 1087, As Amended), It Will Be Necessary To Obtain The Final Decision Of The Water Permit. In A Relationship With A Scope Covering Over 1Km Of The Road, You Must Apply For An Environmental Decision . Documents And Application Are Developed By The Designer.
Contact Information
Address
Miasto Mława,Mława,06-500,Mazowieckie,Pl922 - Ciechanowski
Email
info@mlawa.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 92916923
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.