1. The Subject Of The Contract Is The Implementation Of The Task Entitled: Maintenance, Repair And Service Of A Sanitary And Fire Installation At The Central Park In Gdynia. 2. The Material Scope Of The Order Includes The Provision Of Maintenance, Repair And Service Of Sanitary And Fire Installation Consisting In Particular In Performing The Work Of Periodic Maintenance Of Devices, Inspections, Repairs And Service (Also Through Authorized Devices Manufacturers) Installations In The Parking Lot Of The Underground Central Park In Gdynia. 3. The Subject Of The Contract Was Divided Into Basic Orders And The Order Covered By The Right Options. The Order Is Divisible. 4. The Basic Scope Of The Contract Includes The Performance Of Services In The Scope And Type Specified In The Description Of The Subject Of The Contract, Consisting Of Periodic Maintenance, Inspections, Repairs And The Service (Also Through Authorized Services Of Device Manufacturers) Of Installations In The Parking Lot Of The Underground Central Park In Gdynia, In Particular: 1) Water Supply Installation (Excluding The Water Supply System Located In The Toilet Rooms In The Pom Garage Hall. -1/03, -1/04, -1/05, -1/06, -1/08, -1/09. Installation And Drainage Equipment Of The Underground Car Park, Entrance And Enter The Underground Parking Lot. 4) Smoke Exhaust System, Living Ventilation, Co And Lpg Gas Detection System 5) Sanitary Sewage System Installation. The Scope Of Maintenance Is Not Included In The Sanitary Sewage System Located In The Toilet Rooms In The Pom Garage Hall. -1/03, -1/04, -1/05, -1/06, -1/08, -1/096) Irrigation Installations In The Field Of Pumping And Control Devices, 7) Control Installations, Controllers And Control Cabinets For Control Devices Of The Above Installations, Systems And Devices, Including: A) Co And Lpg Gas Detection System - Boxes Controlling The Gas Detection System Located In The Pom. No Mercor Room No. -1/13, -Mercor Rwg3 Switchgear Room No. -1/11, -Company Rwg1 Switchgear Mercor Room No. 1/10, -Mercor Rwg2 Switchgear Room No D) Sanitary Installation Pump Supporting The Toilets In The Hall Garage, -Pmp1 Aco Multi_Star Ddp 2.2 Agree Driver (Room No , Pkd 3, Pkd 4, Pkd 5, Pkd 6, G) Pump Of Rain Installation, H) Switchgears Of The Water Supply Installation, Fire -Fighting Installation, Rainwater System Installation, Sanitary Sewage System, Irrigation Installation: -Rgh2 Switchgear Room No. -1/13 Rgh3 District Rgh3 Room No. -1/11 -Rgh4 Switchgear Room No. 1/10– Rgh5 Switchgear Room No. -1/02 Rgh1 Dispersion Room No. -1/22I) Heating Cables On The Sanitary Installation And Fire Protection Together With Temperature Regulators Installed On Them And A Thermostat Mounted In A Dashboat Designed To Adjust The Heating Of Sanitary Installations And Fire Protection Installations, J) The Thermostat Electric Heaters Located In Rooms No. 1/02, -1/03, -1/05, - 1/08, -1/10, -1/11, -1/12, -1/13, -1/16, -1/17, -1/18, -1/20, -1/21, -1/22, -1/23. The Setting Description O
|