Part I: Thermomodernization Of A Public Building In Chwalisław 50 Zamawyjing I Would Like To Inform You That All Works Will Be Carried Out In Active Facilities And In Connection With The Above, The Contractor Is Obliged To Obtain All Necessary Consent And Permission Of The Ordering Party And President Of Pp And Pp-U Koma Sp. Z O.O. For The Disability Of The Installation, Necessary Dismantling Of Existing Installations, Installation And Temporary Equipment, Removal Of Temporary Installations And Devices And Re-Installation Of Existing Installations And Each Time On The Basis Of Arrangements Made With The Ordering Party And President Of Pp Koma Sp. Z O.O .. The Order Includes: - Development Of A Construction Project And Other Studies, If They Are Required To Obtain The Consent Of The Architectural And Construction Administration Body For The Implementation Of The Task Developed In Accordance With The Guidelines Of An Energy Audit, - Development Of A Technical Project Containing Appropriate Technical Solutions, Drawings And Calculations, - Project Development Multi -Branch Executive, - Construction Of Construction Works: • Insulation Of External And Internal Partitions, • Replacement Window And Door Joinery, • Modernization Of The Heating System, • Replacement Of Lighting Fittings In The Building For Energy -Saving, • Implementation Of Pv Micro -Installations And Other Resulting From The Solutions Adopted In The Project Documentation - Conducting The Required Tests And Tests, Obtaining The Acceptance Of Works And Preparing Documents Related To Commissioning For Use For Use Built Installations And Building After Thermomodernization Works, Including Thermal Imaging Research And Attempts To Tight The Building. - Transfer Of The Object To The Ordering Party. The Scope Of The Task Of Project Documentation Together With All The Required Agreements, Decisions, Permits, Etc., And Then To Perform All Required Construction Works, Together With The Completion Of The Completion Of Works (If Required) And Transfer Of The Object. The Contracting Authority Expects That As A Result Of Thermomodernization, An Improvement In The Buildings Energy Parameters Will Be Obtained By Reducing Heat Loss By Building Partitions, A Limitation Of Excessive, Uncontrolled Infiltration Of Ventilation Air Reaching Rooms, Increasing The Efficiency Of The Heating System And Reducing Electricity Consumption By Modernizing Internal Lighting Installations And Installation. Pv. As A Result Of The Implementation Of The Work, The Buildings Energy Class Will Be Increased And The Heat And Electrical Energy Consumption Will Be Reduced, And Thus The Amount Of Operational Fees Will Also Be Reduced. An Additional Expected Factor Is Limiting The Emissions Of Pollutants Arising In A Heat Source As A Result Of The Production Of Energy Needed To Heat The Building. It Is Expected To Use Renewable Energy Sources: Solar Radiation Energy. Construction Works. The Task Includes The Execution Of Construction
Contact Information
Address
Gmina Złoty Stok,Złoty Stok,57-250,Dolnośląskie,Pl517 - Wałbrzyski
Contact No.
748164164
Email
um@zlotystok.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 92902382
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.