Sewage Work-Cl22y-Extension Of Wastewater Treatment Facilities For Dobrosloveni-Farcases And Gostavatu-Babiciu-Scarisoara. The Contract Includes Design And Execution Of Works For The Objective Extending The Waste Water Treatment Facilities For The Dobrosloveni-Farcas And Gostavatu-Babiciu-Scarisoara Currently, The Farcasele Agglomeration Does Not Have A Centralized Sewerage System And Treatment Plant. A Treatment Plant Will Be Provided That Will Be Located In The Town Of Farcasele, Olt County. The Treatment Plant Will Be Provided With The Following Facilities: Mechanical Step (Mixing Basin With Mixing System, Pumping Station, Sieve, Biosa And Fat Separator), Biological Step, Sludge Treatment (Aerobic Stabilization, Dehydration) . The Dehydrated Mud Will Be Evacuated Or Stored In The Intermediate Warehouse Located Inside The Treatment Plant. The Equivalent Population Of The Treatment Plant Farcases Is 5 587 L.E. 2. Scarisoara Treatment Plant. Currently, The Scarisoara Agglomeration Does Not Have A Centralized Sewerage System And Treatment Plant. A Treatment Plant Will Be Provided, Located In The Town Of Scarisoara And For Dimensioning The Debts And Loads Of The Waste Water From These Localities Were Taken Into Account. The Treatment Plant Will Be Provided With The Following Facilities: Mechanical Step (Mixing Basin With Mixing System, Pumping Station, Sieve Installations, Densipitation And Fat Separator), Biological Step, Sludge Treatment. The Dehydrated Sludge Will Be Chemically Stabilized With Lime. The Dehydrated Sludge Will Be Evacuated Or Stored In The Intermediate Warehouse Located Inside The Treatment Plant. The Total Equivalent Population Provided For Sizing The Treatment Plant 7 496 L.E. The Contract For The Design And Execution For The Objective Expanding The Waste Water Treatment Facilities For The Dobrosloveni-Farcas And Gostavatu-Babiciu-Scarisoara And Any Documentation Necessary To Obtain The Opinions And Authorizations; Support For The Beneficiary In Obtaining The Necessary Authorizations And Opinions; B) Construction Works; C) Supply And Installation Of Technological Equipment And Equipment; D) Testing And Commissioning; E) Training Of The Beneficiary Personnel. F) Remediation Of Any Defects That Occur In The Warranty Period. G) During The Execution Period Of The Works, The Contractor Will Also Provide The Technical Assistance From The Designer, With All The Legal Attributions That Are For This Purpose. The Duration Of Design And Execution Of Works And Commissioning Of The Installations Is 35 Months, Broken Down As Follows: - Design Stage: 6 Months, - Works Execution Period: 26 Months - Testing And Commissioning Period: 3 Months Period Defective Notification (Pnd) Is 36 Months. The Value Con
Contact Information
Contact No.
+40 349401168
Email
achizitii@caolt.ro
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 92898686
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.