Sanitary Works - Campus Dok Perform Technical Equipment Hls. The Bundeswehr And Bundesbau Go New, Communal Paths In The Renovation, The Expansion And Further Development Of The Hsu Campus. The Hsu Currently Offers 29 Courses In The Fields Of Natural And Engineering As Well As Economic, Humanities And Social Sciences. The Current Building Stock Of The Hsu, Except For Accommodation Buildings And Swimming Pool, Which Are Not Part Of Campus Development, Includes A Gross Area (Bgf) Of Around 88,000 M² And A Gross Area (Bri) Of Approx. 470,000 M³. The Property Is A Military Security Area, The Current Construction Project Is Classified As Open. The Existing Buildings From The Mid-1970S, Which Are Characterized By A Striking Outside Steel Slope Construction, And The Outdoor Facilities Are Under Monument Or Ensemble Protection. The Planning And Construction Work Takes Place During Operation And Should Be Completed In 2035. Before The Start Of The Actual New Construction And Renovation Work, The Allianz Provides Preparatory Measures With Regard To The Infrastructure. The Highly Complex Planning And Construction Task Is Processed In The Course Of An Integrated Project Processing (Ipa). All Actors From Tarpaulins And Construction Relevant To The Project Are Bound By A Multi -Party Contract As An Alliance And Work Together In Cross -Functional Teams From The Start. Through Profit Sharing, All Partners Benefit Together From The Project Success. Cooperation Relies On Collaboration And Trust, Transparency And Openness As The Basis Of Joint Action. Lean Methods Are Used That Make Planning And Building More Efficient And Faster. The Relevant Contractual Regulations Are Summarized In The Cornerstone Paper, Which Is Part Of The Tender Documents For The Participation Competition. A Total Of 9 Partners Are Commissioned (See Above). As Part Of A Master Planning, The Main Topics Of Architecture And Urban Planning, Freedom, Energy And Sustainability Were Processed And The Urban Planning Frame Was Determined. This Planning Should Now Be Further Developed. In The Area Of Architecture And Urban Planning, The Allianz Will Edit The Following Buildings: H1 (Main Building, Primary Teaching, Administration, Office Use): Renovation, Partial Demolition And Supplement By Two New Buildings; Cafeteria: Renovation; House 1 Mbau | Building (Institute Building, Primary Teaching, Research, Workshop, Laboratory): New Building; House 2 Mbau | Building (Institute Building, Primary Teaching, Research, Workshop, Laboratory): New Building; House 3 Mbau | Building Including Central Workshop And Test Halls (Workshops And Test Halls, For Teaching And Research): New Building; House 4 Electrical Engineering (Institute Building, Primarily Teaching, Research, Workshop, Laboratory, Rz): New Building; Library (Library And Teaching): New Building; Aula A1: New Building; Sportzentrum S1 (Supplementing The Existing Swimming Pool With A Three -Field Sports Hall): New Building; Mobility Hub Including A Package Station, Delivery, Material Warehouse And Danger
|