Comprehensive Renovation Of The 3Rd And Fourth Floor In The Student Sailor House Pasat Maritime University Of Technology In Szczecin At Ul. Starzyńskiego 9 In Szczecin ”, Including: 1) Construction Works - Demolition And Disassembly Works, Masonry Works, Works Consisting Of Demolition Of Floors, Plastering, Painting Works, Flooring Floors From Floor Tiles, Pvc Linings, Making New Wall Tiles, Ceramic Tiles, Making Buildings With A G-K Plate, Installation Of Door Joinery Etc., 2) Sanitary Works - Dismantling Works, Works In The Field Of Installation Of Water, Sewage, Central Heating, Sanitary Equipment, Acceptance Works - Tightness Attempts, 3) Electrical Works - Dismantling Works, Laying Wires In Furrows, Assembly Of Switches, Luminaires Lighting, Assembly Of Sockets, Cans, Wires, Measurements, Tests Etc.1.3.1.1 Description Of The Requirements Of The Ordering Party For Task 1 In The Scope Of Implementation And Acceptance Is Determined By: 1) Technical Specifications For The Execution And Receipt Of Construction Works -Stwiorb (Annex No. 7.1 To 7.3 Swz): A) Annex No. 7.1 To Swz Stwiorb Construction Industry Construction Industry Pasat, B) Annex 7.2 To Swz Stwiorb Sanitary Industry Pasat, C) Annex No 7.3 To Swz Stwiorb Electrical Industry Pasat, 2) Nations Of Works By Auxiliary (Annex No Failure Of Pasat Sanitary Works, D) Annex 8.3 To Swz - Bill Of Distrust Of Pasat Electric Works, 3) Annex 9 To Swz- Drawing Documentation Pasat4) The Proposed Provisions Of The Contract Specified In The Contract Template Constituting No. 6 To Swz (Template For Both Tasks) .1.4 Provided By The Ordering Party Of Any Names (Trademarks), Are Sample, And Their Indication Is Aimed At Determining The Expected Standard, While The Ordering Party Allows The Submission Of Equivalent Offers In The Scope Of The Description Of The Subject Of The Contract. 1.5 The Subject Of The Contract Was Determined By Indicating Objective Technical And Qualitative Features And Standards For Which The Examples Are Indicated To Determine Trademarks. Anywhere In The Order Documents, I.E. (Description Of The Subject Of The Contract, Project Documentation Or Technical Specification Of The Performance And Acceptance Of Works), Specific Standards And Provisions Are Established To Meet Materials, Equipment And Other Goods As Well As Carried Out And Examined Works, Will Apply To The Decisions Of The Latest Edition Or Corrected Edition Of The Established Standards And Regulations, Unless Otherwise Decided In The Terms Of The Contract. In The Event That The Cited Standards And Regulations Are State Or Refer To A Specific Country Or Region, Other Appropriate Standards May Also Be Used To Ensure An Equal Or Higher Level Of Execution Than The Cited Standards Or Regulations, Provided That They Are Checked And Approached. The Differences Between The Appointed Standards And Their Proposed Substitutes Must Be Described In Detail By The Contractor. The Contracting Authority Allows Balance Offers. Equally, The Ma
|