The Subject Of The Contract Is The Warming Of The Building Of The Village Common Room In Głuszyn, Together With Accompanying Works And The Execution Of External Stairs, In Particular: Dismantling Of The Existing Section Of Foam Insulation With Plaster, Dismantling The Wooden Soffit, Dismantling Of Sheet Metal Treatment And Roof Above The Entrance From The Sheet, Dismantling, Dismantling Gutters And Drain Pipes, Forging From The Wall Of The Window And Wooden Doors, Installation Of Pvc Window And Door Joinery With Aluminum With Filling, Planting Prefabricated Steel Window Sills, Insulation Of The Facade Facade With Polystyrene Thickness 15 Cm (And 10 Cm In The Case Of A Plinth) With A Coefficient Λ = 0.032W/M* K Or Smaller, Along With The Preparation Of The Ground, Protection Of The Corners A Metal Angle And Mounting Of A Plinning Strip, Execution Of A Facade Expedition From Resin Plaster On A Pedestal, Execution Of A Facade Plaster With Thin -Layer Silicone Plaster On The Facade, Performing New Processing From Galvanized Steel Sheet, Complementing The Roofing And Covering The Roof At The Entrance Of The Roofing Sheet With Galvanized Steel Sheets, Laying Roof Soffit Made Of Wood -Like Plates, Assembly Of Roofing Above The Side Entrance Of The Smoky Polycarioma, On The Aluminum Structure, Making External Stairs Made Of Cobblestones Gr. 6Cm With The Foundation And The Edges. Additional Requirements For Works Covered By The Subject Of The Contract, The Contractor Will Guarantee A Minimum Period Of 3 Years, A Maximum Of 5 Years From The Date Of The Final Acceptance Protocol, All Materials Used To Perform The Subject Of The Contract Must Be In The First Species And Must Have Approvals, Certificates, Certificates And Technical Approvals Allowing For Use In Construction (Approvals, Certificates And Approvals Should Be Provided To The Ordering Party) And Be At Least Technically Equivalent To Devices Adopted In The Pre -City Of Works. The Costs Of Marking, Securing And Conducting Works Should Be Included, The Contractor Bears Full Responsibility For Any Damages And Losses Resulting From The Works, The Contractor Cleans The Construction Site And The Area Adjacent To All Fragments Of Debris, Polystyrene, Door And Window Joinery And Wooden Soffit With The Area Where The Works Will Be Carried Out. The Order Of The Contract Should Be Completed In Particular, In Accordance With: 1) By The Act Of 7 July 1994 Construction Law (I.E., Journal Of Laws Of 2024, Item 725, As Amended), 2) The Regulation Of The Minister Of Infrastructure Of April 12, 2002. On The Technical Conditions To Be Met By Buildings And Their Location (I.E., Journal Of Laws Of 2022, Item 1225, As Amended. Changes), 3) By The Act Of 16 April 2004 On Construction Products (Journal Of Laws Of 2021, Item 1213), 4) A Preliminary Of Works And A Detailed Technical Specification 5) With All Necessary Provisions In The Field Of Construction Law, Safety And Hygiene Work And Fire Protection, Environmental Pro
|