1. Order Name: Renovation Of The Water Tower In Red Bor In The Formula Design And Build. 2. The Subject Of The Order Is The Development Of Project And Cost -Cost Documentation, Including Arrangements With The Conservator Of Monuments And The Execution Of Construction Works, Conservation And Restoration Works In The Formula Design And Build, On The Basis Of Which It Will Be Possible To Complete The Task Under The Name: Renovation Of The Pressure Tower In Red Bor, Located On Plot No. 69/3 In Czerwony Bór, The Commune Of Zambrów. 3. The Subject Of The Contract Includes: A) Development Of Comprehensive Design And Cost Documentation Enabling The Implementation Of The Investment Consisting In The Renovation Of The Historic Water Tower, Containing All The Necessary Industry Documentation, Arrangements And Decisions, Including, Among Others,:- Making A New Floor With Moisture And Thermal Insulation, Among Others - Installation Of Window Joinery - Mounting External Doors - Complement Defects In Walls And Plasters (Among Others, Cleaning The Walls, Effect Of Scalded Plasters And Making New Ones)- Complement The Buffer Oaks Exposed Reinforcing Rods- Protection Against Burglary In The Door And On The Lower Floor (Installation Of Bars)- Execution Of New External Stairs- Ordering The Area Around The Tower - Maintenance And Protection Of The Roof (Covering- If Necessary)- Lamp Installation Solar Windmill For Lighting The Object-By Performing Other All Necessary Renovation And Construction Works) Requirements For Design And Construction Documentation: 1) The Design And Cost Documentation Should Include, Depending On The Type Of Study:-Land Development, Including: Possible Cutting Of Green, Demolition, Demolition, Demolition, Demolition, Demolition, Demolition, Demolition, Demolition Hardening Of The Area, Necessary Technical Infrastructure, Small Architecture Etc., - Building Architecture, - Construction Of The Common Room Building, - External And Internal Electrical Installations, - External And Internal Sanitary Installations, - Detailed And Calculated Costs For All Designed Elements And Solutions, Including Additional Costs Of All Research And Acceptance. Pursuant To The Provisions Of The Entities And Cost Estimates, They Must Have Cpv Codes And References To Stwior, - Technical Specifications Of The Performance And Acceptance Of Works (Stwior) .2) The Contractor Is Obliged To Obtain The Necessary Decisions, Conditions, Arrangements And Permits, Including: - Obtaining A Current Map For Design Purposes On A 1: 500 Scale Needed To Perform The Documentation In Question, - Preparing A Complete Application For Issuing A Decision Determining The Environmental Conditions Of The Implementation Of The Project Together With All Necessary Attachments (If Required) And Obtaining A Decision On Environmental Conditions Of Consent To The Implementation Of The Investment (If It Concerns), - Drawing Up A Report On The Impact Of The Project On The Environment (If Required), -
|