The Subject Of The Public Contract Is Construction Work, Which Solves Construction Work And Change The Use Of House No. 140 In The Village Velká Nad Veličkou. The Intention Is To Change The Building Of An Existing Family House In The Center Of The Village To A Socio-Cultural Facility Of Civic Amenities. Object Area: - Built -Up Area: 248 M2 - Bacted Space: 1546.1 M3 - Utility Area: 183,21 M2 - Courtyard Area: 314.9 M2 - Paved Surface Of The Courtyard: 182.4 M2 The Construction Is Divided Into Buildings: So 01 - Café Room Composition: 1St Underground Floor - Staircase, Hallway, Cellar 1St Floor - Passage, Lee, Vestibule, Corridor, Café 1, Café 2, Café Staff, Hallway, Glazed Shelter Pergolas, Dressing Room, Toilet Staff + Cleaning, Stairs To The Cellar, Hallway, Toilet, Toilet, Hallway, Boiler Room + Cleaning. Total Utility Area Of The Café 135.73 M2. Within The So 01 Café, The Following Partial Parts Of The Building Will Be Carried Out: 1.2 Air -Conditioning 1.3 Wiring And Lightning Conductor 1.4 1.5 Heating 1.6 Internal Gas Pipeline The Café Will Be Located In Front Of The House, With Windows Facing The Square, One Window In The Yard. By Renewed Entrance From The Square We Enter The Spacious Vestibule. By Renewed Entrance From The Square We Enter The Spacious Vestibule. On The Left Side Of The Vestibule There Are Doors In The Area Of Its Own Café. At The End Of The Vestibule, Directly Against The Front Door, There Will Be A Passage Into The Hallway, Where The Floor Will Be Reduced By 20 Cm. On The Left Side Of The Corridor There Will Be Two -Wing Doors, Behind The Staircase To The Cellar. At The End Of The Corridor There Is A Door To A Bathroom For Visitors. The Room Where The Bathroom Is Situated Is Passable To The Hallway From Which The Door Leads To The Courtyard Under The Shelter. On The Opposite Side Of The Corridor Is A Boiler Room With A Cleaning Place. The Space Of Its Own Café Consists Of Two Interconnected, Stylishly Furnished Rooms With Windows Oriented To The Square. The Third Room With A Bar Counter For The Operator Is Illuminated By A Window Facing The Courtyard. This Room Is Passable To The Hallway, From Which It Leads To Employees To The Courtyard. It Is Also Possible To Enter The Dressing Room And Social Facilities For Employees From The Hall. The Room With The Bar Will Be Entry. It Will Be Connected To The Passage By Existing Double -Wing Doors. The Actual Passage Will Be Retained. The Arched Stone Cellar Will Be Modified For The Possibility Of Sitting A Closed Society. The Entrance To The Cellar Will Be Connected To The Restored Entrance From The Street Square. The Cellar Is Entered By Two -Wing Doors Located On The Left Side Of The Hillrock. Behind The Door Is A Stone Staircase Underground, Which Will Also Be Reconstructed. The Sanitary Facilities For Visitors Are Located In The Space Between The Street And The Courtyard Tract And Is Passable To The Yard Of The House, Through A Small Hallway. The Toilets For Men And Women Will Serve Both The Café Guests In The House And The Garden In The Yard. To Increase The Number Of Seats In The Café, A Bioclimatic Pergola With Screens And Sliding Doors In The Courtyard Will Be Installed In Connection With Its Operation In The Courtyard. Its Ground Plan Is 5.2X4m. The Capacity Of The Café Is Designed To 20 Seats Inside, 15 Seats Under The Outdoor Shelter (Seasonal Operation) And 16 Seats In The Cellar. It Is Assumed That The Operation Of The Cellar (Closed Company) Will Not Be Time -Consuming With The Operation Of The Café. So 02 - Space For Rent Room Composition: 1St Floor - Shop, Shop, Hallway, Dressing Room Staff, Toilet+Shower. Total Utility Area For Rent 47.48 M2. The Space For Rent Will Be Accessible By Separate Entrance From The Courtyard. There Will Probably Be A Regional Product Store Or Service Facility. From The Yard We Enter The Hallway. Opposite The Entrance Door Is The Entrance To The Bathroom (With A Cleaning Place) For Service And A Small Dressing Room. The Door On The Right Side Will Enter The Passage Room With A Sales Counter, Which We Will Go To The Next Room Of The Store. The Rooms Have A Wooden Floor And Are Lit By Windows. Next To The Western Gable Of The Building Is A Wooden Shed, Which Is In Disrepair. The Shed Will Be Dismantled And Replaced By A Replica Of The Original Building. Since The Entrance Part (Former Laundry) And Shed Have A Common Roof Structure, It Will Also Be Replaced, Including The Ceiling Structure. So 03 - Paved Areas And Stone Fence Of The Yard Fencing Of The Courtyard Has Already Been Realized, It Is Not Subject To The Order. The House Yard Was Separated From The Public Space With A Wall Built From Natural Stone In Combination With Wood Filler. Access To The Courtyard From The Outer Space Is A Gate For The Pedestrian And The Gate Of The House Entrance In Adamovská Street. Another Goal In The Western Wall Enables Connection With The Green Area In The Garden Behind The House. The Courtyard Of The Yard Will Be Divided Into Two Height Levels Due To The Slope Of The Terrain. Part Of The Courtyard Adjacent To The Café Will Be Paved And Will Be Used For Sitting As An Outdoor Garden Of The Café. In The Corner It Will Be Covered By Installation Of The Construction Of A Biotechnical Pergola, Which Will Extend The Operation Of The Café During The Year. The Reduced Part Of The Courtyard Will Be Grassed And Reinforced In The Busy Parts By Grassing Mat. Greenery Will Be Incorporated Into This Part Of The Courtyard. Both Parts Of The Courtyard Will Be Connected By Equalizing Steps. Along The House Facade In The Street Of The Square Leads 210 Cm Wide. It Is Made Of Concrete Tiles 30X30cm. The House Entrance Is Concreted. The Sidewalk Route Will Be Completely Reconstructed In The Length Of The Facade. The New Sidewalk Will Be Paved With Interlocking Pavement Of Rectangular Format In Natural Color. The Pavement Will Be Laterally Ended With A Curb. In The Longitudinal Direction, It Connects To The Existing Sidewalk Route On Both Sides. Connection To Technical Infrastructure, Connections: The Building Will Be Connected By A New Underground Cable Connection To The Lv Distribution. The Building Will Be Connected By A New Underground Water Connection. The Building Will Be Connected By A New Underground Connection To The Sewer. The Building Will Be Connected By The Relocated Underground Gas Connection.
|