1. The Subject Of The Contract Is To Act As A Building Supervision Inspector Over The Implementation Of The Investment Task Entitled Modernization Of Praszka Sewage Treatment Plant Located In The Pre -Ness At Ul. Główna 7 On Plots No. 14/4, 14/5, 14/7, 14/9, 154, 169, 253/2, 284, 290 - Przedmość Precinct, Plot No. 53 - Krzyżanowice Precinct. As Part Of The Order, There Will Be Supervision Of Robots, Which Include Construction And Equipping With Necessary Technological Devices, Sediment Processing Building, Technological Water And Leachate Water Pumping Stations. The Following Includes The Following Industries: 1) Architectural And Construction: A) Demolition Works) Construction Of Objects2) Road: A) Preparatory Works, Disassembly And Restoration Of The Surface, Development Greenib) Construction Of A New Road System, Square3) Electrical: A) External And Internal Electrical Installations) Akpia Installations, 4) Sanitary: A) External Water-Sewage Networks, Technology) Water-Sewage Installations, Ventilation, Ventilation And Central Heating) Technological: A) Internal Installations Of Facilities, Networks Between The Setting Range. The Duties And Rights Of The Supervision Inspector Include, In Particular: 1) The Full Scope Of Activities Specified In Art. 25 And Art. 26 Of The Act Of July 7, 1994. Construction Law (I.E. Journal Of Laws Of 2024, Item 725, As Amended); 2) Organizing And Conducting Coordination Meetings And Preparing Protocols From These Meetings In Situations Requiring Discussion Of Problems; 3) Giving Opinions And Presenting For Acceptance By The Principal By The Principal Of Any Changes To The Project Requested By The Contractor Of Works; 4) Systematic And Ongoing Monitoring Of The Implementation Of The Investment Process; 5) Ongoing Control Of The Compliance Of The Investment With The Concluded Contracts; 6) Controlling The Quality And Compliance Of Installation Materials, Construction And Devices With Assumed In The Project Documentation And Technical Specifications; 7) Keeping Documentation Related To The Implementation, Including Among Others Required By The Provisions Of The Construction Law, Completing All Documents Provided By The Construction Manager, Such As Material Approvals, Technical Approvals, Test Results, Measurement Protocols, Declarations Of Compliance For The Materials Provided, Etc. After Completing And Settling The Task Or Disappearing; 9) Material And Financial Settlement Of Performed Works; 10) Participation In Partial And Final Acceptance; 11) In The Event Of Additional And Replacement Works-Supervision Over These Works And Preparing And Presenting The Client Necessity Protocols In This Respect; 12 ) Control Of The Correctness Of Entries Made In The Construction Log; 13) A Request From The Contractor Of Construction Works To Make Corrections Or Re -Execution Of Faulty Works, As Well As Suspending Further Construction Works, If Their Continuation Could Cause A Threat Or Unacceptable Non -Compliance With The Pro
|