Construction Of Industrial Control Software Development Services - Reactor Physics Software Systems. 1. Task 2 Description Of The Technical Plan And Jury. The Technical Plan (System Plan) Should Describe The Process Of Current Calculations And Clearly Define The Development Of The New Software System: • Basic Guidelines, • Software Device Base, • The Components To Be Established And Their Reactor Physics, Mathematical Background, • Relationships, • Relationships With External System Elements (Data Provider Eg Measuring System, Data Receiving Data Eg Upper Processing System). The Technical Plan Should Also Provide A Clear Guidance On How To Prove The Adequacy Of The New System, Taking Into Account The Above. 2.2. Developing And Approving The Detailed Development Plan For The New Software System. 2.3. In The First Phase According To The Development Plan, The Creation Of A New Program That Is Capable Of Off-Line For Filling, Campaign-Tracking Calculations And Simpler Security Analyzes For Certain Campaigns Can Be Incorporated Into Online Zone Monitoring Systems (Minimum Technical Requirement). Off-Line Testing Of The Program. 2.4. The Second Phase Of The Development Plan Must Be Created And Tested In An Off-Line Way: 2.4.1. A New Program That Is Capable Of Controlling The Reactor Physics Calculations Of The On-Line Zone System, Processing Incoming Measurement Data, And Conveying The Resulting Results To Higher Processing Levels, Display, 2.4.2. A New Program That Is Capable Of Controlling The Reactor Physics Calculations Of The Transhipment Neutron Monitoring And Reactivity Monitoring System, Processes The Measured Detector Signals And Transmitted The Calculated Results To The Display Level. 2.5. In The Third Phase Of The Development Plan, An Expert Program Package Should Be Created That Allows The Filling Plan And The Transfusion Plan To Create Databases For The Above Programs, Processing Measured Campaign Data For Testing Off-Line Programs And The Production Of Campaign History. Testing The Program Package Off-Line. 2.6. In The Fourth Phase Of The Development Plan, The Software Elements Should Be Created That Allow The Newly Prepared Reactor Physics Software System To Control Off-Line And Online. In Addition, The Simulator Specific Functions Of The On-Line Zone Monitoring System Need To Be Prepared. Testing Software Elements And Simulator Specific Features (Manufacturing Test - Fat). 2.7. The New On-Line Zones Monitoring System And The Transmission Neutron Control And Reactivity Monitoring System Are Commissioned, Start-On-Line Testing (Sat-Level Test, Trial) In Parallel With The Current Verona And Anerem System. Continuous Check And Evaluation Of Test Results (Ticket
Contact Information
Contact No.
+36 75506525
Email
kozbeszerzes@npp.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 92800172
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.