Construction Work - Elte Location C. D Block Energy Renovation. The Subject Of This Procurement Is The Energy Renovation Of The Elte Lágymányos Campus Southern Block Building In The Framework Of A Business Contract For The Long -Term Goal Of This Project To Enhance Energy Efficiency And Energy Saving. According To The Technical Content Of The Design Concept, The Expected Annual Primary Energy Consumption Is Reduced: 10,500 000 Kwh/Year Investment In The Eötvös Loránd University Lágymányosi Campus South Block (Looks) Section 1117 Budapest, Pázmány Péter Promenade 1/C. Hrsz.: It Is Aimed At Renovating And Modernizing The Energy Efficiency Of Its Building Under 4082/31. The Main Mass Of The Building Affected By The Investment Is Cellar, Ground Floor + 8-Storey, 8 Floor Plan; On Its Western Side, A Two -Storey Building (Pie) Containing Higher Capacity Performers And Libraries Is Connected. The Characteristics Of The Exterior Appearance Of The Building Are Provided By A Mesh, Red Covering Window Distribution And Brick Panel Of Architectural Elements Surrounding The Cubes. The Southern Block Was Built On The Pattern Of The Northern Block Completed In 1998, Designed By István Mányi (Rt. Am. Based On The Purpose Of The Building, It Is Divided Into 3 Main Units: Educational Premises/Student Units, Scientific Rooms Of Departments And Representative Premises. Through The Western Main Entrance Of The Pie Building, We Arrive At A Spacious Lobby Followed By A Series Of Lecture Halls On A Wide Road. Above The Hall Is A Large Overhanging Dome That Serves To Illuminate The Interior. Upstairs Is The Library Of The Faculty Of Science And The Faculty Of Information Technology. The Main Building Can Be Achieved Through A Neck, Both On The Ground Floor And Upstairs. The Cellar Level Has Engine Rooms, Warehouses, Labs And Classrooms. The Pie Building Is A Reinforced Concrete Frame Building Structure, With A Monolithic Reinforced Concrete Wall Structure Vented With Clinker Brick. Summary Technical Content Of The Complex Building Energy Renovation: The Energy Modernization Of The Higher Education Institution, Which Contains The Following Works. - Installation And Commissioning New Outdoor Heat Pumps On The Building Flat Roof, Surrounded By Noise Protection Wall - Installation And Commissioning New Air Treatment Machines On The Cellar Level - Building A New Heating Network - New Mechanical Mines, Slab Breaks - New Refrigerator -Heating Fan -Coils In Each Room Modernization, Electrical Electricity Electrical Nutrition This Construction Investment Is Not Subject To Permission, Oét Opinion And Settlement Notification Is Required. 1.) Architecture: - Developing A Slab Break - The Breakthroughs Are Closed In The Plane Of The Slab, Min. Ei90 With A Rated Foaming Tape And Min. Ei90 Certified Mineral Wool Filled Massage Wool Flood Flood Fire Inhibition Planned - Expanding Existing Strangs On Cellar Level - Developing An Approach To Piece Placed Machine
Contact Information
Contact No.
+36 302301559
Email
matisz.gabriella@kancellaria.elte.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 92737314
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.