Works For Complete Or Part Construction And Civil Engineering Work - Széchenyi Beach Development Of Lídó Plan. And Ki.. In The Framework Of The Project Developing The Tourism Infrastructure Of Balatonfüred, Széchényi Beach, Planning And Execution Of The Széchenyi Beach And The Construction Of The Széchenyi Beach As The Following And In The Public Procurement And Additional Documents: Planning: Preparation Of Water Rights Licensing And Construction Plan Documentation Based On The Approval Plan For Public Procurement Documents (Demolition And Construction Of Coastal Plant, Riverbed, Sandy Riverbed, Reinforced Concrete Retaining Wall Construction, Lashing With Sanding, Wpc Terrace Pavement) By Obtaining Declarations, Contributing To Licensing, Uploading And Managing Plans Based On The Water System, And Preparing The Construction Design Documentation (Priced And Priced, Itemized Budget), In Accordance With The Instructions Of The Contracting Authority And The Provisions Of The Public Procurement Documents. In Accordance With The Content And Formal Requirements And Expectations Of The Legislation, Regulations And Regulations In Force, The Provision Of Design Management Until The Construction Is Completed. Quantity Of Plans To Be Transported: The Licensing Plan Documentation Shall Be Produced In The Number And Format Necessary For The Licensing And The Consultation Of The Authority, And For The Contracting Authority, 2 More Copies On Paper, In Hungarian And .Pdf/A; And .Dwg Format Must Be Handed Over In 2 Copies On Electronic Media. The Design Documentation For The Contracting Authority In 2 Copies On Paper, In Hungarian And .Pdf/A; And .Dwg Format Must Be Handed Over In 2 Copies On Electronic Media. The Successful Tenderer Is Responsible For Conducting The Licensing Procedure. Construction: - One -Sided Wallwheel With Vertical Or Oblique Flat Surface, Wood Formwork, Up To 3 M Heights 234.2 M2 - Hydromet Mechanization Riverbed 240 M3 - Landscaping Of Landscapes, With Extraction, Spreading, Without Compression, Machine Force, 18%Field Bending, I- Arc. Divide. In Soil, With Transport, Between 0-1600.0 M, Up To 50.0 M 417.3 M3-Making A Cover For Heavy Use, 6 Cm Stone 12X24x6 Cm, Gray 140 M2-Wpc Paved Sun Terrace To 2500X30x60 Mm Wpc Cushion 56, 6 M2 - Making A Reinforced Concrete Wall 72.3 M3 - Making Soil Improvement Layer For Line Facilities Above 3.00 M Wide, 151 M3 Of Sand. 321/2015. (X. 30.) Government Decree 46 (3) And (5) Of The Government Shall Draw Attention To The Fact That, If The Clear And Clear Definition Of The Subject Matter Of Public Procurement Made It Necessary A Reference To A Person, Patent Or Trademark, The Name Is Only To Clearly Determine The Nature Of The Object
|