Construction Work - Construction Of A Central Workshop. The Implementation, 2600 Vác, Naszály Út 8, 1001/3 Hrsz. The Property Is Owned By The Hungarian State And The Vác Vocational Training Center. The Vác Szc Király Endre Technical And Vocational School Also Operates Here. The Area Is Excavated From The Entrance To Naszály Road, Next To The Gate Building, Not Affected. There Are The Technikum Building And The Gym On Both Sides Of The Entrance. The Installation Of The Site Is Best Determined By The Running Circle And The Grassy Sports Field Besides The Main Building. It Runs Along The Launch Of The Track By The Exploration Road, Up To The End Of The Plot, To The B Building B And The Wallis Workshop. The Design Area Is Located On The Northern Side Of The Alley And The Road: Currently Degraded Asphalted Sports Grounds, And After Demolition, The Organized Area, Dka And The Existing Warehouse Are Located. Real Estate Area: 37.873 M2 Zone: Vi-1 Institutional Area, And Gksz-3 Commercial Service Area Net Floor Space Of The Workshop Building: 3.921.29 M2 • The Glazed Facade Sections Are 464 M2 Of The Heat-Free Aluminum Curtain Walls. • The Facade Element Appears As An Aluminum Facade Lamellar Shading In A Fixed Or Motorized Design Of 640 M2, Which Basically Determines The Nature And Visual Appearance Of The Building. • The Building Is 2257 M2 Of The Building. General Description: The Workshop Is A New Downstairs Plus Two -Storey Buildings With Workshops, Classrooms, Spacious Community Spaces, Kitchen And Dining Rooms, As Well As Administrative Rooms Related To Education. The Existing Dka And Warehouse Building Will Be Connected By A Corridor. Installation, Filling The Mass Formation Of The Planned Building Consists Of Three Main Elements. Two Buildings Of The Same Height Of The Same Height And A Wedge -Shaped Part Of The Building Between Them. On The Ground Floor There Are High -Quality And External Workshops Such As Diagnostics, Alternative -Powered Machines, Cnc, Material Testing. For The Same Reasons, The Kitchen And Dining Room Were Also Designed Here. On The First Floor There Are Cosmetics, Economics And Police Workshops, Classrooms And Teaching Rooms, As Well As Linguistic Rooms, Social Rooms And Labs That Can Be Compensated. On The Second Floor You Can Have Teacher Premises, Director Offices, Secretariats And Archives. From This Level, The Third Mechanical Level Can Be Reached With A Operating Step. Building Structures The Building Is Based On Monolithic Or Prefabricated Reinforced Concrete Points, Prefabricated Reinforced Concrete Pillars With Pillars With Reinforced Concrete Stiffening Walls, Without Internal Support, As Follows. Fundamentation Of The Prefabricated Reinforced Concrete Pillars Sketch Is Made By The Point Foundation And By Combining The Close -Up Points. Depending On The Geotechnical Conditions, Prefabricated, Prefabricated Or On -Site Monolithic Reinforced Concrete Chalice Are Made. Vertical Support
|