Roof Insulation Work - Sealing And Flaring Work - Schwaigweg 1 / Am Dorfbach 15. Deforming And Plumbing Work - Schwaigweg 1 / Am Dorfbach 15Tas Plot Of Land Is Currently Built On With A Residential House -Shaped Residential Stable. The Planned Construction Project Consists Of The Core Renovation Of The Part Of The Building On Fl.No. 47, As Well As Demolition And Replacement Construction Of The Part Of The Building On Fl.No. 47/1, Including An Underground Car Park With 12 Parking Spaces Below The New Building. The Above -Ground Area Is Omitted In The Similar Outline Of The Inventory Of 3 Floors, As Well As A Gallery Floor In The Attic. The Building Is Declared By The Municipality Of Ohlstadt As A Community Center And Contains Several Uses: A Generation Meeting, Rooms For The Event And Clubs, The Tourist Information, Public Toilets, A Multifunctional Room For The Municipality, Three Apartments, And Two Commercial Units With The Respective Gallery Level. Facade Created. Task Description: The Subject Of The Procurement Is The Sealing And Plumbing Work For Described Construction Projects. Description Of The Procurement: - Construction Site Equipment, Devices, Hoists, Holding, Rooms - Own Container On - Workshop And Assembly Plans - Documentation, Evidence - Edging And Rwa, Made Of Aluminum Sheet, Fogged, Gray, Including Chest And Neck Tray, Integration Of The Length - And Transverse Cases, Adaptation To Local Conditions, Size Approx. 1.78X85cm, A Total Of 6 Pieces- Montage System Pv System, Roof Parallel, On Existing Substructure (Roof Module Holder Brick), Adaptation To Regional Wind And Snow Loads, According To The Manufacturers Laying Guidelines, Approx. . 100M Assembly System Including Fasteners And Cuts - Deliver And Assemble The Base, Including 1X Edge, Including All Cuts And Fasteners Small Animal Protection, Material Aluminum, Coated, Approx. 150M - Snow Structure, Alpine Tube, Delivery And Assembled With System Owners, According To Snow Load Calculation, Approx. 60M - Roof Channel, Nominal Size 333, Semicircular With Bulge, Zinc Linch, Rolling Blank, Approx. 60M - Eaves Tin, Zinc Plate, Pre -Matted According To The Roof Pitch, Approx. 60M - Movement Compensation Profile, Zinc Gray, Approx. 4 Pieces, Distance Max. 12M - Gutter Floor, Semicircular, 4 Pieces - Balcony Plug -In Channel With Bulge, Zinc Tin, Rolling Blank, Approx. 60M - Gutter Attachment, Semicircular, Conical Running, Mechanically Welded, Zinc Coated, Rolling Blank, 4 Pcs. Fastening Material - Rainfall Tube, Round, Dn120, Zinc Blanket, Rolling Blank, Approx. 25M - Arch Tube, Angle In Accordance With Def. Approx. 72 °, Zinc Sheet, 4 Pieces - Rain Tube Flap, Including Leaf Trap, Zinc Plate, 4 Pieces - Revision Sliding Piece, With Standpipe Cap, Zinc Sheet, 4 Pieces - Pipe Clamps, Number In Accordance With Manufacturer - Gutters, Number Of Def.
|