1. Renovation Range: A) Hot Mineral And Bullshit Mass (From The Surrounding Ribs) With A Patch Area Up To 15M2- Preparatory And Measuring Works, Marking Of Works, Delivery Of Materials To The Works Area, Purification Of Damaged Places With Cutting Of Patches With A Regular Shape, Removal Of Rumosz On Landfill, Sprinkling With A Binder Of The Bump With The Use Of The Dilatation Tape On The Edge Of The Patch And Spreading The Mineral And Bituminous Mixture In One Or Two Layers Depending On The Depth Of Damage, With The Maintenance Of The Road, Mechanical Density According To Graphic Attachments No. 1, 2, 3, 4 And 5 To Swz- Preparatory And Measuring Works, Marking Of Works, Delivery Of Materials To Works, Milling, Removal Of The Rubble To The Place Indicated By The Contracting Authority, Condensation With A Binder Of The Upper Surface Of The Surface With The Use Of Edge Of The Axis Of The Patch Of Expansion Tape And Spreading The Mineral And Bituminous Mixture In One Layer While Maintaining The Road Level, Mechanical Density Of The Layer Of The Mixture; C) Adjustment Of The Sewage Well (Without Replacing Cast Iron Elements) According To Graphic Attachments No. 1, 2, 3, 4 And 5 To Swz- Preparatory And Measuring Robots, Marking Of Works, Delivering Materials To The Works Area, Cleaning Damaged Places, Removing The Steed To A Landfill, Adjusting A Complete Cast Iron Manhole Using Fast-Resistant Loads Resistant To Load And Sour Environment Or Using Rubber Foundations Or The Use Of Both Technologies Simultaneously, Drizzling With A Binder Of The Bump With The Use On The Edge Of The Cast Iron Well Of The Bituminous Tape Of The Dilatation Tape, Spreading The Mineral And Bituminous Mixture In One Layer With The Preservation Of The Road Level, Mechanical Density Of The Layer Of The Mixture; D) , 2, 3, 4 And 5 To The Swz- Preparatory And Measuring Works, Marking Of Works, Delivery Of Materials To The Works Area, Purification Of Damaged Places, Removing The Rum To A Dump, Adjusting The Cast Iron Body Of The Groove With The Use Of Fast-Resistant Loads Resistant To Loading, Sprinkling The Bump With A Bunch Using On The Edge Of The Cast Iron Body Of The Bituminous Groove Of The Expansion Tape, Spreading The Mineral And Bituminous Mixture In One Layer With The Level Of The Road Level, Mechanical Density Of The Layer Of The Stacked Mixture; E) Adjustment Of The Water Supply Valve (Without Replacing Cast Iron Elements) According To Graphic Attachments No. 1, 2, 3 , 4 And 5 To Swz- Preparatory And Measuring Works, Marking Of Works, Delivery Of Materials To Works, Purification Of Damaged Places, Removing The Rum To A Dump, Adjusting The Cast Iron Body Of The Valve, Condensation With A Bump Of Bumps Along With The Application On The Edge Of A Cast-Iron Body Of The Dilatation Tape Valve, Doling The Mineral And Bituminous Mixture In One Layer While Maintaining The Road Leveling, Mechanical Density Of The Layer Of The Arranged Mixture. Frezowina (Destruct) From The Works
|