Supply And Placing Of Galvanized School School #26, Esp. 0, 45Mm, Dimension (3X1, 5) M, Plotted With Vinyl Adhesive, Posted With 4, 8X40mm Rivets, In Metalon 20X20mm Metal Structure, Esp. 1, 25Mm, Including Self -Clipped Eucalyptus Support Painted With Pva Ink Two (2) Coats, Chemical Toilet Rental, Dimension (110X120x230) Cm, Standard Line, Containing One (1) Hand/Cleaning Hand, Including Maintenance In And Demobilization, Mobilization And Demobilization Of Container, Including Loading, Discharge Etransports In Guindauto (Munck) Body (Munck), Container Exclusively, Thermal Insulation Container Lease, Type 4, For Refectory Debra, With Reference Measures Of (6) Meters Length (2) (2) Meters (2) Measures (2) , 3) Metroslargure And (2, 5) Meters Useful Height, Including Electric Sentern Conditions, Exclusive Mobilization/Demobilization And Provisionalsextern Conditions, Provisional Connections For Type 4 Container (Corresponding To Code Ed- 16351), 14/02/2025, Type 8 , For The Debio Locker Room With Eight (8) Banks And Five (5) Cabinets, With Reference Measures Of (6) Meters Length, 3) Meters Width And (2, 5) Meters Utilintern Height, Including Internal Electrical Connections, Exclusive/Demobilization And Demobilization And Provisional External Connections, Provisional Connections For Type 8 Container (Corresponding To Code Ed- 16355), Mechanical Regularization Of The Domain Range, Excavation, Load And Transport Of 1St Category Material - Executed With 1, 40M³ Excavator And 12 M³ Tilting Truck And With A Natural Bed Service Path - Dmt From 50 To200 M., 40M³ And 12 M³ Tilting Truck And With A Natural Bed Service Path - Dmt Of 200 To400 M, 40M³ And 12 M³ Tilting Truck And Service Path In A Natural Bed - 400 To600 M, 40M³ Dmt And 12 M³ Tilting Truck And With A Natural Bed Service Path - 800 To1,000 M, 40M³ And 12 M³ Tilting Truck And With A Natural Bed Service Path - Dmt Of 1,800 To2,000 M, 40M³ And 12 M³ Tilting Truck And With Natural Bed Service Path - Dmt 2,000 To2,500 M, 2Nd Category Load And Transportation - Executed With 1, 40M³ Excavator And Truck And Truck. 12 M³ Tilting And With Natural Bed Service Path - Dmt Of 1,600 To1.800 M, Loading And Transportation Of 3Rd Category Material - Executed With 2, 50M³ Loader And 12 M³ Tilting Truck And With Bed Service Path Natural-Dmt Of 1,600 To1.800 M, Regularization Of Boot With Spread And Compaction, Mechanical Compaction Of 100% Vibratory Roller Landing, Including Spreading, Regularization Of Sub-Election (Normal Proctor), Sub-Base, Sub-Base, With A Track Mix, 33% Clay And 67% Running Spout, Compressed In The Energy Of The Intermediate Proctor (Execution, Including The Supply Of Running Spout, Excavation And Load Of Deposit Material, Spread, Humidization, Homogenization And Compaction Of The Mixture; Excludes Soil Acquisition And Material Transportation), Transportation Of Deposit Material For Conservation. Average Transport Distance & Lt; = 10, 00 Km (Bica Run And Clay), Base, 15% Clay And 85% Running Spout, Deposit Material Transportation. Average Distance Detransporte & Lt; = 10, Printing (Execution And Supply Of Bituminous Material, Exclusive Transport Of Bituminous Material), Transportation Of Material Of Any Kind. Average Transport Distance & Gt; = 50, 10 Km, Connecting Painting (Execution
|