Renovation Of Classrooms And Provision Of Computer Laboratory Along With English Language Laboratory, Equipment Required For The Laboratory, School Upgradation And Furniture For Upgradation In Ittigi, Utthangi, Kantebennur, Hirebannimatti G.H.P. Schools In Huvinahadagali Taluk(Hoa Kkrdb For The Year 2024-25) - Miscellaneous And News Paper Charges,Third Party Inspection And Qa Charges 1%,Gescom Deposite Charges,Electronic Trivector Meter (Etv),Led Flood Light,Led Bulb,Fixingaceiling /Wallmounting Fan,Ceiling Fan,Batteries 12V 100 Ah Capacity,Off-Line Ups System,Batteries 12V 200 Ah Capacity,On-Line Ups System,Installation Charges For Split Type Ac,Supplying Of Voltage Stabilizer,Trinvertor Type Splitair Conditioner,Labour Charges For Laying,Lt Ug Cable(11 Kv ),Digging Treanch,Earth Electrode For Grounding,Fixing False Ceiling /Led Fittings,Cat 6E Lan Cable,Switch Mounting Rack,Patch Panel For Lan Cabling,Cat 6 Patch Cable,Wiring For Lighting/Power Circuit 4Mm2,Wiring For Lighting/Power Circuit 2.5Mm2,Wiring For Lighting/Power Circuit 1.5Mm2,Wiring For Lighting/Power Circuit 1.0Mm2,Mcb Distribution Boards 40 A Tpn,Mcb Distribution Boards 6-32 A Dp,Mcb Distribution Boards 6-32 A Sp,Mcb Distribution Boards,Supplying & Fixing Of I/O Socket,Supplying And Fixing Of Modular Switch 6/16A Universal Socket,Supplying And Fixing Of Modular Switch 32A Dp Switch,Supplying And Fixing Of Modular Switch 6A Three Way Socket,Supplying And Fixing Of Modular Switch 6A One Way Switch,Supplying And Wiring Adopting Loop System Long Point Above 6Mtr Upto 10Mtr From Tapping Point To Out Let Via Switch Box,Supplying And Wiring Adopting Loop System Medium Point Above 3Mtr Upto 6Mtr From Tapping Point To Out Let Via Switch Box,Supplying And Wiring Adopting Loop System Short Point Upto 3Mtr From Tapping Point To Out Let Via Switch Box,Led Modular Down Light 2Ftx2ft 36 W Luminaire,Modular Switch Mounting Polycarbonate Plate-18 Module,Modular Switch Mounting Polycarbonate Plate-6 Module,Modular Switch Mounting Polycarbonate Plate-4 Module,Pvc Modular Box 18 Way,Pvc Modular Box 6-Way,Modular Box 4-5 Way,Supplying And Fixing Of Pvc Casing And Capping On The Wall,Water Purification Plant 50Lph,Water Purification Plant,Unplasticised Polyvinyl Chloride (Upvc) Pipes,Polyethylene Water Storage Tank,Centrifugal Pumpset,Collapsible Steel Shutters,Blindes For Window Curtain,Fixing Of Door Frame,Providing And Fixing In Position Fully Panelled Matti/Nandi Wood Shutters For Doors,Frames Of Doors,Painting With Synthetic Enamel Paint Of Approved Brand,Finishing Walls With Premium Acrylic Smooth Exterior Paint,Wall Painting With Premium Acrylic Emulsion Interior Paint,Two Track Upvc Windows,Fall Ceiling,Conference Table Of Size Height 2.5Ftxwidth 2Ft Made Out Of 18Mm Plywood For Top And Front.Table Shall Be Provided With Footrest With Suitable Mm Plywood,Wardrobe,Shoe Stand Of Size W4ftxh2.5Ftxd15inch,Made Out Of 18Mm Ply With Veneer As Per Design. The Door Of The Shoe Stand Should Be Made Of 3Inchx1.25Inch,Notice Board,Computer Work Station,Computer Monitor-Maximum Resolution- 2560 X 1440, Screen Size 26.81-28.74 Inch,Led Backlit Lcd,Image Aspect Ratio 21To9, Refresh Rate (In Hz) 60 To 80,Almirah Steel With Glass Door,Almirah Steel,Public Place Seating Chair(3 Seater),Newspaper Reading Stand,Rectangular Adjacent Side Of Leg Classroom Tables,Class Room Table,Mike Of Speaker,Pa Speaker,Amplifier For Public Address System,Green Board-Ceramic Steel Surface Material Of The Dry Erase Writing Board,Suitable For Writing With Chalk Magnetic,Dimensions (In Mm) L X W 1200 X 2400,S Type Chair,Plastic Chair,Wooden Podium,Display(75 Inch) Interactive Panel With Cpu With Warranty 3 Years,4K Uhd-3840 X 2160,Memory (In Gb) 8 Number Of Touch Points (In Number) 40,Colour Printer,Smps,Poe+ Layer 2 Access Switch,Rack (2U),Sata Hdd,Nvr,Dome Camera,Language Lab,High Back Executive Chairs,Revolving Chairs,Wired Headset,Antivirus Software,Microsoft 365 Office,Windows Home Operating System,Desktop Computer,Air Fiber,Spc Flooring,Box 5G,Charger Unit For Router,Wifi Router
|