1. The Subject Of The Contract Is To Determine The Framework Conditions Regarding Public Procurement, Implemented On The Basis Of Executive Agreements That The Contractors May Be Granted During The Period Of The Framework Agreement, Hereinafter Referred To As The Planned Provisions Of The Framework Contract. 2. The Employer May Award Orders Referred To In Point 1 For Construction Works At The Nbp Headquarters In Warsaw, At Ul. Świętokrzyska 11/21 And Transylvania 5A And Facilities Used By The Nbp In Warsaw, I.E. At Ul. Jasna 8, Jasna 12 And Warecka 11A, Including Work, Such As: 1) Works Of The Construction Industry: A) General Construction Works:- Forging Holes And Pierce,- Plaster Supplementation,- Replacement Of Windows And Doors,- Supplementing Wall Coverings; B ) Floor Robots:- Breaking Floors, E.G. From Rain, Carpet, Etc.,- Cleaning And Repair Of The Substrate,- Supplementing The Floors As Above; C) Painting Works:- Deleting Stains,- Supplementing Plaster Coats On Walls And Ceilings,- Preparation And Preparation And Preparation Grinding The Surface Of Walls And Ceilings,- Painting; D) Roofing Works:- Roof Repairs Using Thermosal Felt,- Roof Repair Using Evalon Roof Foil,- Sealing Leaks With Support Support Supports,- Sealing Leaks With Leaks With Sheet Metal Processes And Lighting; 2 ) Robots Of The Electrical Industry: A) Disassembly And Laying Of Cables And Electric Cables, B) Disassembly And Installation Of Lighting Fittings, Electrical Installation Equipment, Fuse Boards Along With The Preparation Of The Ground And Accompanying Works, C) Completing All Materials Needed To Perform The Abovementioned Works, D) Execution Of All Auxiliary Works To Prepare The Ground, E) Ordering And Marking Cables, Wires And Other Installation Elements In Renovated Rooms, If Necessary And Will Be Required By The Supervision Inspector, F) Conducting The Required Tests And Tests And Their Confirmation With The Protocols Qualifying The Assembly Element Electrical Installation; 3) Sanitary Industry Works: A) Renovation Works Of Sanitary, Rain And Combined Sewage System Installations, Including: - Replacement Of Sewage Levels, - Replacement Of Sewage Departments, - Inspection Insertion, Storm Valves, Aeration Valves, - Renovation And Repair Of Sewage Wells , - Checking The Tightness Of The Sewage Cables; B) Renovation Works Of The Cold, Warm And Hydrant Water Installations, Including: - Replacement Of The Levels And Departments Of Cold, Warm And Hydrant Water, - Replacement Of Shut -Off Valves And Other Fittings On Risers And Levels, - Replacement Of Sanitary Facilities So -Called White Assembly And Fittings, - Adjustment And Rinsing Of The Installation, - Execution Of Tightness Tests; C) Renovation Works Of Central Heating Installations, Technological Heat, Including: - Replacement Of The Levels And Sponsters Of The Central Heating And C.T Installation, - Replacement Of Fittings At Levels And Divisions C.O And C.T Installations, - Replacement Of Radiators With V
|