Wastewater Treatment Plant Construction Work - Construction Of A Municipal Municipal Sewage Treatment Plant In Świecie.. The Subject Of The Contract Is The Implementation Of The Investment Task - Execution Of Construction Works Entitled Construction Of The Urban Sewage Treatment Plant In Świecie. The Project Is Aimed At Building A Sewage Treatment Plant Exclusively For Municipal Wastewater. To This End, It Is Expected To Renovate/Modernize Existing Facilities And Build A Biological, Sedimentary And Biogas Part With An Accompanying Infrastructure And A Cable Of Cleaned Sewage With A Departure To The Wda River. 4.4 After The Implementation Of This Investment, The Sewage Treatment Plant Will Include The Following Technological Objects: 1) The Sewage Part (Mechanical And Biological Cleansing): A) The Speed Of Extinguishing Speed Blocked With The Chapter Chamber - Ob. 01 - Modernized, B) The Building Of Mechanical Sewage Treatment - Currently 02 - Modernized, C) Sewage Pumping Station - Currently 03 - Modernized, D) Durable Sewage Station - 04 - Designed, E) Preliminary Settlers - Ob. 05.1, 05.2 - Designed, F) Preliminary/ Retention Settler - Ob. 06-Designed, G) Pix Tank-Ob. 07 - Designed, H) Biological Reactor - Ob. 08 And 09 - Designed, I) Secondary Settlers - Currently 10.1, 10.2, 10.3, 10.4 - Designed, J) Pumping Plant And Blowers Building - Currently 11 - Designed, K) Technological Water Reservoir - Ob. 12 - Designed, L) Sheepskin And Pre -Settlement Tank - Currently 13 - Designed, M) Cleaned Sewage Tank - Currently 14 - Designed. 2) Sedimentary Part: A) Gravitational Thickeners Of Excessive Sludge - Ob. 15.1, 15.2 - Designed, B) Failored Sediment Reservoir / Pre -Sludge Thickener - Currently 16 - Designed, C) Ominous Air Biofilter - Currently 17 - Designed, D) Dehydration Building - Currently 19 - Designed, E) Dehydrated Sediment World - Currently 20 - Designed, F) Lime Silo - Ob. 21 - Designed, G) Operational Building - Ob. 26 - Designed. 3) Biogas Part: A) Separate Fermentation Chamber (Wkfz) - Ob .25 – Projektowany, E) Zbiornik Biogazu – Ob.30 – Projektowany, F) Sieci Międzyobiektowe Wraz Z: Modułem Osuszania – Ob.B.01, Filtrami Redukcji Siloksanów – Ob.B.02. Essential Weapons And Wells 4) Accompanying Objects: A) Traystacja-Ob.18-Designed, B) Energy And Primary Building-Ob.27-Designed, C) Administrative And Social Building-Ob.29-Designed, D) Squares And Maneuvering Roads, E) Between Specific Networks Along With The Necessary Weapons, Backers Chambers And Wells, F) Pipeline Draining Sewage Cleaned To The Wda River. The Employer Requires Contractors To Conduct A Local Vision In The Field In Order To Read The Conditions For Performing The Subject Of The Contract. Local Vision Is Obligatory. The Organizational Details Of The Vision Are Specified In Chapter A Detailed Description And Manner Of Implementation Of The Subject Of The Contract Was Specified In The Project Documentation
|