Structural Steelworks - Extension Of Glass Greenhouse On The Mpi For Molecular Plant Physiology In Potsdam - Steel Construction Work. Steel Hall Construction Made Of 6,369 Kg Pet Ippe 180, 3,934 Kg Steel Frame Ipe 300, 5.222 Kg Steel Frame Ipe 400, 8 St Frame Corners Voute, 4.029 Kg Steel Carrier Ipe 500, 1,498 Kg Steel Support Ha 200, 674 Kg Steel Support Ipe 330, 4.687 Kg Steel Support Heb 200, 1.903 Kg Steel Carrier Hea 200, Approx. 250 Kg Wall Association, 688 Kg Umbrella Organization; 17,553 Kg Of Steel Girders Ipe 240, 8,100 Kg Steel Girders Ipe 500, Approx. 327 M² Grid, 120 St Grid Foldable, 615 M² Roofing Sandwich Panels Including Connection Plates, 8 Pcs Lamp Rwa Incl. Approx. 831 M² Facade Clothing Sandwich Panels Including Connection Sheets, Steel External Staircase Made Of 35 Kg Steel Support Hq80-4, 152 Kg Cantilever Arm Ipe 200, 5900 Kg Staircase, 2 Hours Of Platform, Approx. 64 Hours Of Grating. Approx. 8 Hours Of Railing Horizonatel/Vertical, 85 Kg Support Foot, 277 Kg Cheeks; 4 Stezle Ladders, 55 M Maintenance/Inspection System + Rope Protection System, 9 M Maintenance/Inspection System With Railings One-Sided, 4 M Maintenance/Inspection System With Railing In Two Sides, Hall Railings From 895 Kg Of Edges, 460 Kg Of Knee Bars, 378 Kg Footstep, 395 Kg Round Bars , 160 M Handrail, 176 St End Caps Handrail; 55 M Overhead Rail Safety System. Special Note Regarding Bidding Questions Due To Special External Events (E.G. Sars-Cov-2 Or Ukraine War): Please Take Into Account Any Possible Or Recognizable Impairments, E.G. With Regard To The Availability Of Materials And Products, Workers, A Possibly. Delayed Provision Of Required Evidence, Effects On Any Subcontractors Etc. Questions That Occur In This Context, We Ask You To Ask In Good Time Before The Offer. Execution Periods: The Execution Must Begin Within 12 Working Days After Receipt Of The Request By The Ag (§5 Paragraph 2 Clause 2 Vob/B). The Request Will Be Required. Approach Until 06.11.2025. The Performance Is To Be Completed (To Be Completed By Nozzle) Within 45 Working Days After The Deadline Specified Above. 5 Working Days/ Week. The Estimated Duration Mentioned Under Section 5.1.3 Of The Eu Announcement Is Working Days.
|