Construction Work - Elte Savaria Sports Hall Energy Renovation. The Subject Of This Procurement In Szombathely Is The Energy Renovation Of The Elte Savaria Sports Hall Building In The Framework Of A Business Contract For The Long -Term Goal Of This Project To Enhance Energy Efficiency And Energy Saving. According To The Technical Content Of The Design Concept, The Expected Annual Primary Energy Consumption Is Reduced: 1,500 000 Kwh/Year The Building Affected By The Investment Lies In 5555 Topographical Numbers In Free Installation, Connected By A Joint Entrance Corridor With The Building Next To It. The Building Is Two -Storey, Basement Plus Ground Floor. The Mass Of The Building Consists Of Two Main Parts: The High Space Of The Hall And The Reception Building In Front Of It. The Basement Includes Out-Service Features, Changing Rooms, Warehouses, Gyms, Running Corridors, Medical And La-Wine Rooms, As Well As Mechanical Rooms. There Are Also Serving Features On The Floor Of The Head Building: Offices, Shops, Gym; And The Sports Hall Is Here. The Character And Function Of The Building Is An Educational Building. Complex Building Energy Renovation Summary Technical Content: Replacement Of Windows And Windows, Facade Insulation, Roof Insulation, Mechanical Modernization, Lighting Upgrade, Solar System. This Construction Investment Is Not Subject To Permission, A Township Notification Is Required. 1.) Architecture: The Following Energy Interventions Occur In External Bordering Structures: - Hall Roof Insulation - Head Building Insulation - Facade Insulation - Replacement Of External Windows, External Shading 2.) Mechanical Engineering: - Existing Ventilation Systems And Secondary Heat - Installation And Commissioning Of A Central Air Handle By Heat Recovery - Construction And Commissioning Of A New Air Technology System - Building And Commissioning A New Heat Pump System 3.) Eplum: - Point -Like Replacement, Efficient Led Technology Without Converting The Underlying Network - Solar System Installation And Commissioning During Construction Work, The Building Will Not Be In Use. The Workspace Transfer Is Accurately Reconciled With The Successful Tenderer After The Contract Has Entered Into Force, According To Which It Is Necessary To Prepare The Lane Schedule. Ak Draws Attention To The 321/2015. (X. 30.) Government Decree 46 (3). (The Nature And Quantity Of Construction Investment, Goods Or Service, And Definition Of Demands And Requirements) Ak Draws Attention To The Clear Reference To The Subject Matter Of The Public Procurement. However, The Contracting Authority Shall Ensure The Equivalent Bid To Determine Its Nature.
Contact Information
Contact No.
+36 302301559
Email
matisz.gabriella@kancellaria.elte.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 92482332
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.