Structural Shell Work - New Construction Climate Chamber Center At The Mpi For Molecular Plant Physiology In Potsdam - Shell Construction Work. Short -Performance Description; 1 X Schrebstüst, 1,120 M² Of Gravel Layer, Approx. 710 M³ Filling Work Space Construction Pit, 1,096 M² Pe Film, Approx. 55 M³ Of Cleanliness Layer, Approx. 258 M³ Of Location Concrete Floor Slabs Including The Edge Formwork, Approx. 147 M³ Of Location Concrete Foundations Including Formwork, 2 M³ Of Device Base Location Concrete Including Formwork, 140 M³ Of Trench Excavation, 125 M³ Of Excavation, 35 M³ Covering Sand, 150 M Cowl, 150 M Injection Hose Including Pressure Sample, Refusal, 150 M Of Pressing Work Joint, Approx. 1,502 M² Perimeter Insulation, 145 M Fleece Laminated Bobbin, + Drainage Plates ; 145 M² Bitumen Solution Ahead With Eisnchl. Cleaning The Surface, 145 M² Of Bitumen Welding, 11 M³ Of Leachate, Installation, 112 M Filter Fleece, 112 M Flex. Drän Tube, 2 Hours Of Control Shaft, 156 M³ Of Location Concrete Outdoor Wall Including Formwork, Approx. 22 M³ Of Outside Supports, 13 M³ Attica Ort Concrete Including Formwork , 48 M³ Inner Wall Location Concrete Including Formwork, Approx. 68 M³ Of Location Concrete Ceiling Including Formwork; 54 T Concrete Steel, 16 T Concrete Steel Mats, 1 St Distribution Column On The Outside + 35 M Cable, Approx. 140 M Outer Cable Symmetrical, Approx. 100 M Electrical Installation Tube, 3 Pc Distribution Box, 30 St Measuring/Checking Data Connection, 25 M Cable, 50 M Dismantling Existing Cable, 610 M Foundation Earth, 54 St Connection Flag, 3 St Connection To Potential Control, 290 M Wrestler, 26 St Connection Flags, Approx. 127 M Full Wall Pipes Including Wastewater Including Junction, Double Sleeve, 9 Hours Of Floor Drain With The Execution: Within 12 Working Days After Access The Request By The Ag (Section 5 (2) Sentence 2 Vob/B); The Request Will Be Required. Approach Until 06.08.2025. The Performance Must Be Completed (Ready To Take Off): Within 65 Working Days After Above Specified Period For The Start Of Execution. At 5 Working Days/ Week. Special Note Regarding Bidder Questions Due To Special External Events (E.G. Sars-Cov-2 Or Ukraine War): Please Take Into Account Any Possible Or Recognizable Impairments, E.G. With Regard To The Availability Of Materials And Products, Workers, A Possible . Delayed Provision Of The Required Evidence, Effects On Any Subcontractors Etc.
|