Tenders are invited for Pw Csp - 105176 - Eagle Mountain Water Treatment Plant Phase Iv Expansion Construction Of A New 35-Million Gallons Per Day (Mgd) Expansion Of The Existing Eagle Mountain Water Treatment Plant (Wtp) On The Existing Plant Site. Facilities And Improvements Will Include: [1.] Liquid Oxygen (Lox) Storage And Vaporizers [2.] Ozone Generation Building And Associated Ozone Generation Equipment [3.] Ozone Contact Basins With Side-Stream Injection And Off-Gas Destruct Equipment [4.] Coagulant Chemical Storage Area And Feed Pumps [5.] Treatment Structure With Rapid Mix Basins, Flocculation Basins, And Plate Settler Sedimentation Basins [6.] Granular Media Biological Filters With An Administration Space Located Atop The Filter Pipe Gallery [7.] Filtered Water Break Tank With Vertical Turbine Backwash Pumps And Membrane Feed Pumps [8.] Membrane Building With Membrane Filtration System Facilities And Plant Chemical Feed Equipment [9.] Chemical Storage Tank Area [10.] Washwater Recovery Basins And Recycle Pump Station [11.] Electrical Building And Related Electrical Systems Throughout [12.] Civil Site Work Including Grading, Dewatering, Vaults, Excavation And Excavation Support, Paving, And Yard Piping. This Includes Sanitary Sewer Relocation And A New Nsiii Finished Water Pipeline. [13.] Instrumentation And Controls And Physical Security Measures For An Integrated And Operation System.
Contact Information
Address
100 Fort Worth Trail Fort Worth TX 76102 · (817) 392-6118 · (817) 392-2409
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 92435220
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.