1. The Subject Of The Contract Is The Development Of Project Documentation Together With The Development Of Investor Cost Estimates For A Complex Of Multi -Family Residential Buildings Together With The Infrastructure In Chorzów At Michałkowicka Street. 1) The Purpose Of The Study1) Developing Multi-Branch Design And Cost Documentation (Hereinafter Referred To As Documentation) Together With The Development Of The Land Development Project, Based On The Architectural Concept, Which Is The Possession Of The Employer. Scope Of The Study: Area Development Project For The Entire Plot (Plot Number 287/6, 290/6, 291/6, 262/6, 293/6), Playgrounds, Roads And Parking Lots And A Retention Reservoir, Taking Into Account The Adjacent Area Of Plots Of Numbers 288/6, Architectural And Construction Documentation For Buildings 3A (A1, A2, A3) And 3B (B), Including Construction Design, Technical Projects, Executive Projects, Other Required Studies Necessary For Proper Construction Implementation, System Designing Required Rainwater Collection And Drainage In Plots That Will Be Attached To The Retention Reservoir (Also In Terms Of The Task). It Should Be Combined With A Rainwater Sewage System Built In Stage I And Ii, Due To The Fact That The Concept Describes A 15-Minute City, And The Contracting Authority Plans To Give Up Service Premises At This Stage, It Will Be Necessary To Change In The Scope Of A1, A2, A3 Solutions - Resignation From The Premises Will Force A Probable Change In The Amount Of Buildings And In The Ground Floor System. Works And Cost Estimates 6) Preparation Of Technical Specifications For The Implementation And Acceptance Of Construction Works For All Industries7) Obtaining A Water And Legal Permit8) Obtaining The Required Environmental Decisions9) Obtaining All Consents And Making Agreements With Network Gestors, Owners Of Neighboring Land And Any Other Infrastructure10) Developing Reconstruction Projects Or Security Of The Network And Infrastructure In Collision With The Designed System11) Obtaining A Final Decision On The Building Permit12) Transfer Of Copyright To The Contracting Authority13) Authors Supervision Over Construction Implementation. 2) B. Detailed Scope Of The Study) Development Of A Multi-Branch Architectural And Construction Design, Plot Development Or Land And A Technical Design Based On An Architectural Concept Owned By The Ordering Party, Demolition Project And, If It Occurs, A Project To Rebuild Networks And Technical Infrastructure Together With All Necessary Decisions, Approvals, Arrangements, Permits, Deviations, Additional Design Studies, Auxiliary Studies Necessary For This Design Phase Of The Design Phase. Research, Expertise, Opinions Required In Accordance With Applicable Regulations. In Addition, Analyzes Should Be Carried Out On Entering Into An Economy With A Closed Circulation (Possibilities In The Scope Of Dismantling The Object Or Adaptation Of Buildings In Accordance With Iso 20887) And Analysis
|