Work Shed, In Resigned Plywood Plate, Including Sanitary Facilities And Furniture, Lease Of Wooden Pickets, Supply And Placement Of Plaque In Galvanized Plate 26, Esp. 0, 45 Mm, Plotted With Vinyl Adhesive, Posted With Rivets 4, 8X40 Mm, In Metalon 20X20 Mm Metalon Structure, Esp. 1, 25 Mm, Including Autoclaved Eucalyptus Support Painted With Pva Two (2) Coats, Provisional Water Connection To The Flowerbed, Including Water Meter And Eastern Water Measurement, Galvanized Steel 20Mm (1/2) Dealer , Local Administration 6, 23 Of The Total Value Of The Work - Governed By Arcordão 2622/2013 Of The Tcu, Component Of The Direct Cost Of The Work And Comprises The Administrative Structure To Support The Execution Of The Construction, Composed Of Technical Management Personnel, Office Staff And Safety Personnel (Watchtower), 10/02/2025, Mobilization And Demobilization Of Work In Urban Center Or Bordering Region With Value Of 1,000,000, 00, Mechanized Cleaning Of Vegetable Layer, Vegetation And Small Trees (Trunk Diameter Less Than 0, 20 M), With Treadmill Tractor.Af05/2018, Cut And Landfill, Landfill/Reternal Clay (With Transport Up To 10 Km), Soil Launch And Scatter, Exclusive Apiraling, Manual Regularization And Mechanized Compaction Of Land With Vibratory Plate, Exclusive Deforestation, Destruction, Cleaning/Mowing Of The Terrain, Guide Settlement (Curb) In Straight Stretch, Made Of Prefabricated Concrete, Dimensions 39X6, 5X6, 5X19 Cm (Length X Lower Base X Base Base X Height), For Delimitation Of Gardens, Squares Or Tours. Af05/2016, Gravel Ballast With Crushed Stone Number 2 And 3, Including Densifying And Manual Apiillating, Application Of Plastic Canvas For The Execution Of Concrete Floors. Af04/2022, Execution Of Ride (Sidewalk) Or Concrete Floor With Concrete Molded In Loco, Machined, Conventional Finish, Thickness 8 Cm, Armed. Af08/2022, Alert Or Directional Podotal Floor, Based On Mortar. Af05/2023, Ramp For Disabled Access, Simple Concrete Fck = 25 Mpa, Performed, With Indicative Painting, 02 Coats, Floor Paint With Acrylic Paint, Manual Application, 2 Coats, Included Preparator Background. Af05/2021, Emerald Grass Planting In Plates, Including Plant Land And Conservation For Thirty (30) Days, Water Measurement Kit, Masonry Embedded, In 25Mm (3/4) Galvanized Steel - Local Dealership, Exclusive Hydrometer, Metal Tap For Irrigation/Garden, Chrome Finish, Wall Application, Including Supply And Installation, Final Cleaning For Delivery Of The Work, Backbread, Compr = 1, 50M, Width = 30Cm, Cast Iron Foot And 10 Rulers Of Wood, Including Painting, Installation Of Double Metal Trash, 60 L Capacity, In Carbon Steel Tube And Baskets In Electrostatic Painting Steel, On Soil. Af11/2021, Provisional Connection With Air Power Input, Cemig Standard, 15, 1Kva Installed Load To 30Kva, Three -Phase, Underground, Including Post, Meter Box, Circuit Breaker, Bus, Grounding And Accessories, Concrete Armed Strap 20 Mpa, Including 5 Cm Skinny Concrete 9 Mpa, Lateral And Deforming, Sealing Masonry With Flat Ceramic Brick, Esp. 19Cm, For Coating, Including Mortar For Settlement, Chapisco With Mortar, 1: 2: 3 (Cement, Sand And Gravel) Trait, Applied With
|