Mobilization And Demobilization Of Work In Urban Center Or Bordering Region With Value Up To 1,000,000, 00 - 0, 50 Of The Total Value Of The Work, Local Administration 6 Of The Total Value Of The Work - Governed By Arcordão 2622/2013 Of Tcu, Component Of The Direct Cost Of The Work And Comprises The Administrative Structure To Support The Execution Of The Construction, Composed Of Technical Direction Personnel, Office Staff And Safety Personnel (Watchmen), Manual Demolition Cemented Or Scale Floor, With Maximum Thickness 10Cm, Including Removal And Stacking, Exclusive Transportation And Removal Of Demolished Material, Transport Of Demolished Material In Bucket, Exclusive Manual Or Mechanical Load, Manual Load Of Any Nature On Truck, Exclusive Transport, Manual Removal Of Glass In Frames, With Or Without Reusing, Including Cleaning, Removal And Stacking, Exclusive Transport And Removal Of Removed Material Not Reusable, Sealing Masonry With Flat Ceramic Brick, Esp. 14Cm, For Coating, Including Mortar For Settlement, Chapisco With Mortar, 1: 3 Trace (Cement And Sand), Esp. 5Mm, Applied In Masonry/Concrete Structure With Spoon, Including Mortar With Mechanized Preparation, Single Layer Mortar Coating, Applied To Wall, Esp. 20Mm, Manual Application, Exclusive Chapisco, Wall Loss With Running Mass (Pva), Two (2) Coats, Including Painting Sanding, Preparation For Drumming Or Painting (Latex/Acrylic) Wall, Including One (1) Coat Of Sealer Acrylic, Wall Painting, Exclusive Acrylic Sealing And Acrylic/Running Mass (Pva), Manual Demolition Of Ceramic Brick Or Concrete Block, Granite Threshold, Swallow Gray, Esp. 3Cm, Polished Finish, Seating With Industrialized Mortar, Including Rejunction, Full Door Wood 1 Fl.0, 90X2, 10M-Rev.Lamine, Supply And Settlement Of Rigid Pvc Tube, Cold Water, Dn 25 Mm (3/4), Even Connections, Manual Ditch Excavation With Depth Less Than Or Equal To 1, 5M, Including Side Discharge, Manual Ditch Funding With Socket, Exclusive Excavation, Manual Drilling Of A Brake, Including Removal, Exclusive Frame, Structural Concrete , Transport And Removal Of Excavated Material, Cycloopic Concrete, Fck 15Mpa, Prepared On Work With Concrete Concrete, With The Addition Of 30 Hand Stone, Including Launch, Thickening And Finishing, Concrete -Filled Concrete Block Masonry, Concrete With Fck 15Mpa , Esp. 19Cm, Including Mortar For Settlement (Detail Of Seds Caderno), Full -Fck -Fck -Fck -Flt Concrete Block Masonry, 20 Mpa Apparent Concrete Pillar, Including Plasticized Pan And Deforming, Waterproofing With Asphalt Emulsion, Clay Or Mud For Landfill (With Transportation Up To 10 Km), Mechanized Landfill Compaction With Vibratory Plate, Including Manual Spreading, Scheduling Counterpart, Sp. 50Mm, Masonry Lashing Strap With Structural Concrete Block, U -Type Channel, (Fbk 4, 5Mpa), With Apparent Finish, Exclusive Grade And Frame, Ribbed Lattice With Three Longitudinal Bars Interconnected By Two Sinusoidal Diagonals Supply And Installation, Verga, Pre -Pre -Installation -Molded With Up To 1, 5 M Of Span, Thickness Of 20 Cm. Af03/2024, Unidirectional Pre -Molded Slab With Expanded Polystyrene Filling (Eps), Capping
|