Design, Support, Supply, Installation And Commissioning, Training, Warranty And Amc Of Medical Cyclotron With Turnkey Design, Support, Supply, Installation And Commissioning, Training, Warranty And Amc Of Medical Cyclotron With Turnkey (Complete Scope As Per The Attached Document In Specification) , [Equipment -Medical Cyclotron System] Medical Cyclotron-Bunker Type, Unshielded With4 Numbers Niobium Liquid Target For 18F Production (Self Shielded), 2 Numbers Niobium Liquid Target For 68Ga Production (Unshielded Or Self Shielded), 1 Number Solid Target ( For Production Of 64Cu,89Zr, 68Ga) (Unshielded Or Self Shielded) Along With Necessary Operator And Personnel Safety Interlock System , [Equipment -Medical Cyclotron System] 18F Based Synthesis Module Fully Automated Cassette-Based Synthesis Module With Suitable Dual Vertical Hotcellor Equvivalent To Handle 20 Ci Of F18 Radioactivity (Each Working Chamber)For Routine Production Of 18F Based Radiopharmaceuticals. , [Equipment -Medical Cyclotron System] Synthesis Research Module General Purpose 18F Radiofluorination Module With Suitable Dual Vertical Orequvivalent Hot Cell , [Equipment -Medical Cyclotron System] Solid Target Irradiation, Processing And Synthesis System Solid Target Processing System With Electroplating+Recovery Of Enriched Target+Purification) Automated Module For Synthesis Of Radiopharmaceuticals Of Zr89,64Cu, Withsuitable Hot Cell (100 Mm Lead Thickness) [Separate Prices To Be Provided For Hotcell With Camera And Hotcell With Pb Glass Window For The Working Chambers Of The Hotcells] , [Equipment -Medical Cyclotron System] Fully Automatic Dispenser (18F) Fully Automatic Dispenser For Vial Dispensing With Suitable Hot Cell To Handle 20 Ci Of F18 Radioactivity , [Equipment -Medical Cyclotron System] Dispenser For Solid Target-Based Rp One Dispenser For Solid Target-Based Radio-Pharmaceuticals With Suitable Hot Cell To Handle Minimum Of 5 Ci Of Activity. , [Equipment -Medical Cyclotron System] 68Ga Based Synthesis Module Fully Automated Synthesis Module For Radio Labelling Of 68Ga Produced From Cyclotron With Suitable Dual Vertical Hot Cell Orequvivalent [Separate Prices To Be Providedwith Camera And With Pb Glass Window For The Working Chambers Of The Hotcells] , [Quality Control System ] Hplc Hplcwith Autosampler , [Quality Control System] Gas Chromatography Gas Chromatography With Fid And Autosampler , [Quality Control System] Tlc Scanner , [Quality Control System] Ph Reader , [Quality Control System] Mca Solid State Basedmca , [Quality Control System] Dose Calibrator Dose Calibrator For Qc, Lead Shielding , [Quality Control System] Bet System Endotoxin Test System For Quality Control , [Quality Control System] Bod Incubator , [Quality Control System] L-Bench L-Bench For Target Maintainance , [Quality Control System] L-Bench (Qc) L-Bench For Qc Of Pet Radioharmaceutical , [Quality Control System] Laminar Flow Benches , [Radiation Monitoringequipment] Central Radiation Monitoring System System Includes Software For Online Data Acquisition And Backup For Six Months. , [Radiation Monitoringequipment] Gamma Area Monitor Gamma Area Monitor (0-100Mr/H) , [Radiation Monitoringequipment] Remote Probe High Rangegamma Monitor With Remote Probe , [Radiation Monitoringequipment] Stack Monitoring System Nai Detector For On Line Stack Monitoring System Lead Castle For Stack Monitoring Probe Integrated Radiation Monitoring Computer System With Complete Cabling Up To The Top Floor Of Building. Stack Monitoring Channel Local Alarm Units Software System For Stack Monitoring Monitor Channel Connection Kit Spare Parts Kit For Stack Monitor, Stacking Monitor Channels, Area Monitors , [Radiation Monitoringequipment] Hand & Foot Monitor , [Radiation Monitoringequipment] Personal Pocket Dosimeters (Digital) , [Radiation Monitoringequipment] Portable Gamma Dose Rate Portable Gamma Dose Rate Meter + Contamination Probe , [Radiation Monitoringequipment] Portable Survey Monitor For Neutron , [Radiation Monitoringequipment] Remote Probe Survey Neutron Monitor (High Range) , [Radiation Monitoringequipment] Portable Survey Meter , [Radiation Monitoringequipment] Air Samplers , [Radiation Monitoringequipment] Teletector Dose Rate Probe , [Laboratory Equipment] Fixed Particle Counter , [Laboratory Equipment] Cameras For Cyclotron Vault Radioactive Resistant Camera System For Cyclotron Vault , [Laboratory Equipment] Ups 200 Kva Ups With 30 Min Backup , [Laboratory Equipment] Ultrasonic Cleaner (Ss-Material Rust Free, 5 Liters Capacity) , [Laboratory Equipment] Digital Weight Balance (Low Range- Accuracy -0.00001 G, Preparing Reagent For Fdg) , [Laboratory Equipment] Capper & De-Capper , [Laboratory Equipment] Glassware Washing Machine , [Laboratory Equipment] Medical Refrigerator ~200 Litre (Upto -30ºc With Controllable Temperature And Capable Of 24 Hours Temp. Recording With Alarm) For Chemicals , [Laboratory Equipment] Normal Refrigerator >400 Litre With Two Doors , [Laboratory Equipment] Fume Hood With Anti-Blow Back Valve, Approximate Dimension 1200Mm´ 700Mm´1300Mm , [Laboratory Equipment] Compact Pet Re-Useable Shipping System Vial Pig Compatible With The Dispenser (Shielding Capacity 2.5 Ci) , [Laboratory Equipment] Micro Pipette With Micro Pipette Tips Box , [Laboratory Equipment] Waste Gas Decay System Waste Gas Decay Systemwith Four Storage Tanks , [Laboratory Equipment] Air Compressing System Air Compressing System (500 Litres) , [Laboratory Equipment] Water Purification System Water Purification System To Produce Hplc Grade Water , [Laboratory Equipment] Tool Kit Tools For Maintenance Of Cyclotron, Hot Cell, Qc Equipment And Synthesis Moduleincluding Suitable Digital Multi-Meter, Digital Current Meter, Best Quality Soldering Iron, Best Quality Drill Machine, Best Quality Two Digital Temperature And Two Humidity Meter , [Panelling Work (Refer Annexure B)] Metallic Walk Able Ceiling Panel With Aluminum Coving And Fitting Arrangement , [Panelling Work (Refer Annexure B)] Return Air Risers , [Panelling Work (Refer Annexure B)] Terminal Hepa Diffusers , [Panelling Work (Refer Annexure B)] Doors , [Panelling Work (Refer Annexure B)] Glazing (Looking Glass) , [Panelling Work (Refer Annexure B)] Door Interlocking System , [Flooring And Painting (Refer Annexure C)] Pu Paint (Walls, Ceiling) , [Flooring And Painting (Refer Annexure C)] Pu Flooring , [Flooring And Painting (Refer Annexure C)] Vitrified Tiles Flooring , [Flooring And Painting (Refer Annexure C)] Anti Skid Tiles Flooring And Skirting , [Flooring And Painting (Refer Annexure C)] Kotah Stone Flooring And Skirting , [Flooring And Painting (Refer Annexure C)] Ips Flooring , [Civil (Refer Annexure D)] Earthwork Excavation In Foundation , [Civil (Refer Annexure D)] Soling Below Foundation , [Civil (Refer Annexure D)] Pcc Below Foundation , [Civil (Refer Annexure D)] Dismantling Concrete For Window , [Civil (Refer Annexure D)] Rcc In Foundation , [Civil (Refer Annexure D)] Reinforcementsteel , [Civil (Refer Annexure D)] Pre Cast Rcc Roof Slab Over , [Civil (Refer Annexure D)] Extra For Lifting And Placing Concrete Beams , [Civil (Refer Annexure D)] Structural Steel-Ismb-500 , [Civil (Refer Annexure D)] Ips Flooring , [Civil (Refer Annexure D)] Brick Work Above Existing Wall , [Civil (Refer Annexure D)] Plastering , [Civil (Refer Annexure D)] Pop Coat To Plaster Area , [Civil (Refer Annexure D)] Steel Scaffolding , [Civil (Refer Annexure D)] Terrace Waterproofing , [Civil (Refer Annexure D)] Construction Of Gas Bank (2.5 X 4 Sq Metres) , [Chimney(Refer Annexure F)] Satisfy Aerb Requirement-Fornon Return Exhaust Of Cyclotron Vault Area, Hotcell Area And Technical Corridor Of Hotcell Area , [Furniture(Refer Annexure I)] Stainless Steel Table With Granite Topping (900 Mm Height)Each Unit Shall Be 8*750Mm In Length With Storage (Full Length -1, Drawer-Cupboard-2; Drawers-8) , [Furniture(Refer Annexure I)] Stainlesssteeltable With Granite Topping Corner Unit.Each Unit Shall Have 8 Full Length Storage Units , [Furniture(Refer Annexure I)] Over Head Storage Units (900Mm Width) , [Furniture(Refer Annexure I)] Laboratory Chairs (Suitable For 900 Mm Height Working Tables) , [Furniture(Refer Annexure I)]Mid Back Synchro Chair Or Equivalent , [Hvac(Refer Annexure J)] Ahu , [Hvac(Refer Annexure J)] Chiller For All Four Ahu (Sufficient For All Ahu) , [Hvac(Refer Annexure J)] Chillers (25 Tr) , [Hvac(Refer Annexure J)] Aluminum Ducting With Insulation And Finishing (500 Meters) , [Hvac(Refer Annexure J)] Bms , [Lead Shielding (Refer Annexure K)] Lead Bricks With Interlocking Bricks ( 100Mmx100mmx50mm) , [Lead Shielding (Refer Annexure K)] Lead Container For Target Window’S Foils Storage, Lead Shield Thickness 60Mm, Height 240Mm , [Lead Shielding (Refer Annexure K)] Lead Brick Box With Four Partitions With Individual Doors Covered By Ss Sheet, Lead Shield Thickness 50Mm, Inside Approximate Dimension 260Mm´210Mm´210Mm (W´D´H) , [Lead Shielding (Refer Annexure K)] Local Shielding By Lead Brick Protective Wall. Lead Thickness 50Mm, Usable Space Size Inside Shield Should Be Minimum 50Cmx30cmx30 Cm With Interlocking Bricks , [Lead Shielding (Refer Annexure K)] Lead Shield For The Trench (Delivery Lines) For 20 Ci 18F. (The Lead Cover Thickness Is To Be Calculated By The Supplier According To The Activities Transferred To Hot Labs Without Exposure To Personnel.) , [Elv (Refer Annexure L)] Main Power Distribution Panel , [Elv (Refer Annexure L)] Power Distribution Panel For- Ahu And Chillers , [Elv (Refer Annexure L)] Power Distribution Panel For- Lighting, Power Points, Misc Ellaneous , [Elv (Refer Annexure L)] Power Distribution Panel For Cyclotron And Other Supplied Equipments , [Elv (Refer Annexure L)] Earthing Pits And Earthing Connections For All Equipments , [Elv (Refer Annexure L)] Cabling And Wiring, Wiring Trenches And Concealing , [Elv (Refer Annexure L)] Voltage Stabiliser , [Elv (Refer Annexure L)] Telephone Lines , [Elv (Refer Annexure L)] Internet Lines And Networking , [Elv (Refer Annexure L)] Cctv -Entire Facility , [Elv (Refer Annexure L)] Access Control , [Mechanical (Refer Annexure M)] Mechanical And Sanitary Work , [Uhp Gas Distribution System (Refer Annexure N)] Ultrapure Gas Distribution Systemas Mentioned In The Specification/Room Book The Vendor Has To Prepare The Design Ofuhp Gas System , [Uhp Gas Distribution System (Refer Annexure N)] 1/8 In Line - Ss316l, Ultra Cleaned – Coil Required By Supplied Equipments , [Uhp Gas Distribution System (Refer Annexure N)] 1/4 In Line - Ss316lin 6 Meters Pieces-Ultra Cleanedrequired By Supplied Equipments , [Uhp Gas Distribution System (Refer Annexure N)] 1/2 In Line- Ss316l-6 Meters Pieces-Ultra Cleanedrequired By Supplied Equipments , [Uhp Gas Distribution System (Refer Annexure N)] Gas Regulators Tapingpoint- Equipment Supply Side Ss 316 L As Specified , [Uhp Gas Distribution System (Refer Annexure N)] Gas Regulators-Double Cylinder-Cylinder Side As Specified In Document , [Uhp Gas Distribution System (Refer Annexure N)] Compressed Airline :The Vendor Has To Prepare The Design As Per Requirement. , Post Warranty - 1St Year Comprehensive Maintenance Contract (Cmc) Charges , Post Warranty - 2Nd Year Comprehensive Maintenance Contract (Cmc) Charges , Post Warranty - 3Rd Year Comprehensive Maintenance Contract (Cmc) Charges , Post Warranty - 4Th Year Comprehensive Maintenance Contract (Cmc) Charges , Post Warranty - 5Th Year Comprehensive Maintenance Contract (Cmc) Charges , Post Warranty - 6Th Year Comprehensive Maintenance Contract (Cmc) Charges , Post Warranty - 7Th Year Comprehensive Maintenance Contract (Cmc) Charges , Post Warranty - 8Th Year Comprehensive Maintenance Contract (Cmc) Charges , Post Warranty - 9Th Year Comprehensive Maintenance Contract (Cmc) Charges , Cost Of Essential Items- Not Listed Above Butrequired To Make The Facility Fully Functional (Break Up In Tabular Formshould Be Listed Separately)
|