Construction Work - An Active City Of Stalowa Wola For Young People.. 1. Order Title: Active City Of Stalowa Wola For Young People. 2. The Investment In Question Will Consist In The Construction Of A Public Building With The Necessary Technical Infrastructure And Land Development. The Planned Facility Is A Public Building Belonging To The Xv Category - Sports And Recreation Buildings. 3. The Body Of The Building Is A Cuboid Partly Recessed In The Embankment In Such A Way That The Level Of The First Floor Is At The Level Of The Area On The Eastern Side Of The Building. The Block Of The Building At The Roof Level Has Been Divided Into Parts That Were Raised At Different Heights. The Height Of Individual Parts Is Related To Their Functional Purpose. The Facades Are Designed As Partly Finished With Stainless Steel Corrugated Sheet And White -Colored Polycarbonate Panels. In The Ground Floor In The Main Entrance Zone And Service Premises, The Facade Is Designed As A Glass Facade With A Light Lock, Similar In Color To The Corrugated Sheet Used To Finish The Walls. The Building Is A Medium -High (Sw) Building, With Two Floors, With A Height Of The Highest Part At +17.91M 4 Usable - 6739.4 M2 Movement Area - 418.4 M2 Service Area - 24.9 M2 Number Of Floors - 2 5. The Basic Scope Of Works Includes: Preparation Of The Construction Site, Earthworks, Removal Of Collision With Underground Weapons, Construction Of The Youth Sports Center Building With All Installations And Connections, Attention! The Scope Of The Subject Of The Contract Does Not Include The Execution Of The Heating Connection, In Accordance With The Terms Of Mzk No. 13A/Np/2023 Of 19.12.2023 Point 10 Point A) The Project And Material Implementation Of The Heating Connection Will Be Made By A Heat Supplier, I.E. Mzk. The Boundaries Of The Property Chapter Will Be The First Shut -Off Valves From The Heating Network. The Contractor In Its Valuation Should Not Take Into Account The Documentation Covering The Heating Connection Project. The Contractor Is Obliged To Omit The Items Regarding The Implementation Of The Heating Connection In The Bill Of Time When Preparing The Offer (Item 205-228), These Items Do Not Constitute The Scope Of The Order And Should Not Be Included In Both The Valuation And The Implementation Of Works. Facility Equipment, Reconstruction Of The Congress, Construction Of Parking Lots And Maneuvering Roads, Construction Of Lighting And External Monitoring, Land Development, Including Dirt Park, Amphitheater, Mini Basketball Pitch, Furnished Greenery.
Contact Information
Contact No.
+48158194710
Email
zp@stalowawola.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 92291326
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.