1 . Rubber-Asphalt, • Spreading A Mineral-Bituminous Mixture Up To 4 Cm Thick In The Abrasive Layer, • Defects Greater Than 4 Cm Should Be Flowed With Material (E.G. Milling With Milling-Destruct), Thicken, And Then Sprinkle It With Asphalt Emulsion And Spread The Upper Layer From A Mineral-Bituminous Mixture With A Maximum Thickness Of Up To 6 Cm (After Collapsing). • Flooding The Surface Of The Working Connector And Sprinkling With Dry Fine -Grained Loose Material (E.G. Sand), • The Thickness Of The Abrasive After Falling: To A Thickness Of 4 Cm, Maximum 6 Cm, • Cleaning Up The Workplace And The Area Adjacent To The Area Of Works Together With The Export And Utilization Of Debris. B) Task 2 - Performance Of The Bituminous Overlay Proper Levels And Transverse Declines, • Export With Debris Utilization, • Cleaning Up The Workplace And The Area Adjacent To The Area Of Works. • Possible Alignment And Supplementation Of The Foundation With Asphalt Concrete With Variable Thickness Depending On The Depth Of The Cavities, The Possibility Of Supplementing The Defects To A Depth Of 10Cm, • Mechanical Cleaning Of The Road Surface, • Sprinkling Of The Substrate, • Making The Surface From A Mineral Andphalt Resident As For Kr2 Traffic, • Pouring Paddles Flood Mass, • Cleaning Up The Workplace And The Area Adjacent To The Area Of Works. C) Task 3 - Replacement / Supplement / Change Road Elements. Renovation Range: • Excavating The Outer Wall Of Elements With Rejection Of The Soil To The Side Of The Road, • Dismantling The Bituminous Surface At The Curb, • Demolition Of The Existing Element, • Demolition Of The Foundation, • Making A Concrete Bench With Concrete Resistance B-20 With Dimensions (Basics 40X10, Resistance 15X15), • Arrangement Of A Recovered / New Curb To The Right Height, Possible Arrangement Of These Elements On Arches, • Reproduction Of The Surface Along The Curb Occurs Depending On Task 1 Or 2, • Loading, Export And Utilization Demolition Materials, • Backfill Of The Outer Part Of The Element And Thorough Cleaning Of The Area. • Marking Of Works In Accordance With Applicable Regulations.D) Task 4 - Road Works Related To The Regulation Of Technical Infrastructure Devices In Connection With The Implementation Of Tasks 1, 2: The Scope Of Work Includes: • Marking Works In Accordance With Applicable Regulations, • Photo Of The Cover (Covers, Hatching, Grate, Etc.) Of The Underground Device, • Dismantling Of Damaged Surfaces Around The Well: Manual (Chisels, Wire Hooks, Paving Hammers, Or Steel Rugs, Etc. - In The Case Of Surfaces Ankle), Or Mechanical (In The Case Of Monolithic Surfaces, E.G. Asphalt, Concrete Surfaces) - With A Vertical Cut -Out Edge With A Circular Saw And Dismantling Of The Road Structure With The Help Of Pneumatic Hammers, Steel Rings, Etc.), • Dismantling The Damaged Upper Part Of The Well (E.G. . Cast Iron Parts, Reinforced Concrete Slabs Under The Well, Support Vertebrae, Etc.), • Collecting And Taking Or Rejecting E
|