Roof-Covering Work-General Renovation Zugspitz-Realschule Garmisch-Partenkirchen / Roofing And Flaring Work. Refurbishment Of The Zugspitz Realschule In Garmisch- Partenkirchen: Metal Roof Covering Made Of Color Aluminum Tape In Double-Standing Folding Technology, Running And Maintenance Bars On The Roof Surfaces, Rope Protection System On The Roof Surfaces, Wall Covers, Gutter And Roof Heaters And Fastening System For The On-Site Pv System. Version: New Building Component 3 And Existing Components 1 And 2. Roof Cuffs 8 ° To 19 °, Ridge Heights Up To Approx. 14.50 M Above Ok Terrain. Overview Of Essential Individual Services With Quantities: Creation Of All Evidence (Windsog Calculation, Snow Load, Etc.); Creating Work And Assembly Planning; Creation Of A Assembly And Construction Process; Construction Site Facility; Approx. 2860 M2 Separation System; Approx. 2680 M2 Standing Fold Cover With Color Aluminum Band; Approx. 330 M Allowance Passport And Special Shares; Approx. 180 M Allowance Slanted Cuts; Approx. 650 M2 Allowance Long -Slide; Approx. 270 M Allow Graubünden Fold; Approx. 380 M Allowance Of The Eaves; Approx. 300 M Brewing Plate; Approx. 200 M Advance Sheet; Approx. 300 M Perforated Sheet; Approx. 130 M Ridge And Place Gear Training; Approx. 190 M Upright And Cap Strips; Approx. 200 Pcs. Fraoschmaulluken Hoods; Approx. 19 Pieces Ventilation Tube With Cover And Folding Cuff; Approx. 25 Pcs. Roof Windows; Approx. 110 M Ingredients Skylight Straps And Glass Roof; Approx. 20 Pieces; Approx. 40 M2 Grid Rust Catwalk Cover; Approx. 400 M Snow Set With Ice Catchers; Approx. 200 M Box Channel Including The Inlet Plate, Strain Compensation, Corners And Gutter Kettle; Approx. 190 M Water Drain Tube; Approx. 980 M. Heating Tape For Gutter Heating; Approx. 190 M Connection Line 1.5 Mm: Approx. 190 M Connection Line 2.5 Mm; Approx. 160 Pieces Of Spacers; 2 Pieces Of Moisture And Temperature Sensor; 2 Pcs. Ice And Snow Fields; 2 Pieces Of Tax Distribution; Approx. 15 M Wall Covers Aluminum Sheet; Approx. 60 Pieces Of The Start, Corner And Intermediate Supports For Rope Protection System; Approx. 150 M Stainless Steel Rope; Execution Begins: 04/22/2025, Completion Date: 15.08.2025 Zwischententrine: The Handover Of The Architectural Plans To The An Is Within 6 Wt After Assignment. Start Of Provisions And Work And Assembly Planning After Receiving The Architectural Plans, Probably In Kw 17 (22.04.2025). Completion Of All Evidence And The Work And Assembly Planning Including Incorporation Of All Corrections By 20.05.25 At The Latest (Kw 21). Execution On Site (Assembly): Start: 19.05.25 (Kw 21), Completion Of All Services Up To 15.08.25 (Kw 33).
Contact Information
Contact No.
+49 8821751404
Email
liegenschaften@lra-gap.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 92268232
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.