Tenders Are Invited For Architectural, Engineering And Planning Services - Thw Ov Wittenberge - Object Plann ... in Germany
Tender Notice
TenderID
92267627
Tender Brief
Tenders Are Invited For Architectural, Engineering And Planning Services - Thw Ov Wittenberge - Object Planning Buildings And Interiors - Energetic And Structural Renovation + Renewal Heat Generation System
Architectural, Engineering And Planning Services - Thw Ov Wittenberge - Object Planning Buildings And Interiors - Energetic And Structural Renovation + Renewal Heat Generation System. The Measure Includes The - Energetic Renovation Of The Building - In Parts Structural Renovation Of The Building - Renewal Of The Heat Generation System - Partly Repair Of The Elt System - Partially Renewal Of The Inner And Outer Lighting System. The Existing Building Was Built In 1970. It Is Used By The Thw As A Service And Administration Building. The Property Is Not Permanently Occupied. In Connection With The Implementation Of The Measures, It Should Be Noted That Partial Use Of The Building By The Thw Local Association Must Be Made Possible During The Renovation. A Section Of The Construction Work Must Therefore Be Taken Into Account. In 2017, Structural, Energetic And Fire Protection -Related Reprocessing Measures Were Carried Out On The Building. In This Context, Two New Escape Staircase Systems Were Installed. The Facade Was Dressed In A Wdvs. The Roof Insulation And Insulation And Rain Drainage Have Been Renewed. The Measure Is Divided Into Different Lots. As Part Of The Energy -Efficient Building Planning, The Energy Efficiency Fixtures For Climate -Neutral Building Renovations Of The Federal Egb 55 (See System) Must Be Applied. With A View To The Climate Protection Goals, The Economically Optimal Energy Efficiency Execution Must Be Examined In The Variant Examination. (An Egb 55 According To The Aforementioned Energy Efficiency Requirements Has An Annual Primary Energy Requirement, Which May Contain A Maximum Of 55 Percent Of The Legally Stipulated Requirements For The Energy Efficiency Of A New Building At The Time Of The Entry Into Force Of This Energy Efficiency. To Be Observed For Local Associations In The Valid Version (E.G. Custom: Version 2.0, As Of December 2020, See System). The General Requirements Mentioned There (Accessibility, Security, Etc.) And The Requirements For The Premises (Room Equipment, Technical Systems, Etc.) Must Be Taken Into Account. As Part Of The Energy Planning Planning, It Must Be Examined Which Measures Are Required For The External Components So That The Maximum Values Of The Average Heat Transfer Coefficients Of The Heat -Transmission Areas Are Not Exceeded In Accordance With Table 2 Of The Appendix To The Energy Efficiency Fixtures Of Federal Buildings. The Existing Outdoor Windows And Doors Must Be Exchanged As Part Of The Energetic Renovation. The Summer Thermal Insulation According To Quality Level 2 Or Better Must Be Demonstrated In Accordance With The Evaluation System, Sustainable Construction For The Building. Federation Buildings In The Sense Of Decree Must Generally Be Operated Without Active Cooling Systems. The Design Planning Is Carried Out To Comply With The Energetic Requirements. For The Feasibility Study, At Least Plausible And Comprehensible Form Are To Be Submitted To The Implementation. Here, Both The Shortage Of The Annual Primary Energy Requirement As Auc Is
Contact Information
Address
An der Wache 2
Contact No.
+49 12345678
Email
Info.Vergabe-FbT@BLB.Brandenburg.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 92267627
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.