Cultural Event Organisation Services - Code, Purchase Of Prison Complete Content. As A Result Of This Public Procurement Procedure, The Contracting Authority Intends To Ensure The Digital Content Of The Institutions Operated By The Contracting Authority On The Basis Of A Framework Contract With The Contractor, Through The Adaptation Of Works Created By Performers, Artists, And Other Individual Artists. Contracting Authority Intends To Spend A Net Of $ 350,000,000 For Digital Content, Productions, Performing And Fine Arts By 2025.12.31, In The Following Breakdown: 1. Immerzet 360◦ Right To Use: 226,400 000 Ft (Planned 2- Max 5 Pieces, Of Which Min 1. Max 3 Domestic And Min 1-Max 2 International Creation) 2. Immerzivate 180◦: 33,580 000 Ft (Planned Min 15- Max 35 Pieces, Of Which Min 10 -Max 25 Domestic And Min 5 -Max 10 International Works) 3 Exhibition, Experience Corner Content: 18 700 000 Ft (Planned Min 20 -Max 30 Pieces, Of Which Min 10 -Max 15 Pcs Domestic , And Min 10-Max 15 International Artwork) 4. Vr, Animation Content: 20 000 000 Ft (Planned Min 20- Max 30 Pieces, Of Which Min 10 -Max 15 Domestic And Min 10-Max 15 International Fine Artists, Graphic Artwork: 20,960 000 Huf (Planned Min 30- Max 40 Pieces, Of Which Min 20- Max 25 Domestic And Min 10- Max 15 International Works) 6. Light Installations, Other Installations: 10 000 000 Ft (Planned Min 5- Max 15 Installations, Of Which Min 2- Max 5 Domestic And Min 3 Max International Installations) 7. Performers, Professional Performers, Stage Shows, Production: 15 360 000 Ft (Planned Min 10- Max 30 Productions, Of Which Min 5-Max 15 Domestic And Min 5- Max 15 International Productions) 8. Professional Performers, Moderators: 5 000 000 Ft (Planned Min 5- Max 10 Pcs Lectures, Of Which Planned Min 3-Max 5 Domestic And Min 2-Max 5 International Lectures) Total: Planned Min 107-Max 195 Creation/Production/Lecture, Of Which Min 61-Max 108 Domestic And Min 46-Max 87 International Implementation Of Creation/Production/Lecture. The Above List Is Only Used To Illustrate The Frequency Of The Incidents. The Contracting Authority Intends To Obtain Individual Orders Based On The Specific Requirements Of The Framework Contract, During The Performance Period, By 2025.12.31 At The Latest. In This Procedure, The Contracting Authority Plans To Obtain The Ready -Made Creations, Works And Stage Production Of Digital Works, Performers And Artists Related To The Institutions Detailed Below. The Detailed Technical Description Of The Occurring Categories Is Included In The Flood Platform. During Each Ad Hoc Orders, The Contracting Authority Indicates The Category In The Floodplain, Namely The Artist, Performer, Artist, And The Title, Name Of The Work To Be Purchased, And The Conditions Agreed Between The Contracting Authority And The Creator/Artist/Author, The Gap
|