Construction Work - Ou Troisdorf, Sieglar - Eschmar, Bw 6, Bw 12, Tbw A And Road Construction. -Ut Construction Of The Cycling And Sidewalk Overpass Pastors-Bitze (Building 6, Paragraph No. 5108 668). -Ut Construction Of A Section Of The Adjacent Support Wall (Bw 12, Partial Structure A, Abs No. 5108 674 A). -Funding Expansion Of The Residents Roads Wielandstrasse And On The Schindkaule Over A Total Length Of Approx. 120M. -C. Convention Of The Cycling Path Connections In The Area Of The Pastorsbitze/Building 6. -Meard Of The Connection Eichendorffstraße To Spicher Straße. -Coutication A Dam Structure Of Approx. 100M In Length. -Ut Construction Of The Street Lighting. -Conishing A Railing For The Cycle/Sidewalk System On The Embankment Top Edge In The Area Of Building 4 And The Account Point L332n/Evrystraße. In The Present Construction Measure, The Traffic Areas Of Wielandstrasse And On The Schindenkaule, Which Are Planned South Of The Pastors-Bitze (Bw 6). The Following, Rough Sections Arise For Earthworks As Part Of The Road Construction: -Parallel To Wielandstrasse, An Earth Wall Must Be Produced At Approx. 100M In Length. -Perd Work For The Production Of The New Road Superstructure Of The Residents. -Am East Of The Retaining Wall 11 The Support Wall Is To Be Released Over A Length Of Approx. 20M In Order To Be Able To Carry Out The Work On The Retention For Building 6. Finally, This Area Must Be Filled Again With A Tendency Of 1: 1.5. Analogous To The Production Of The Northern Resistant And For The Partial Building Of The Retaining Wall 12. The Combined And Cycle Path System, Which Is Being Built In The Course Of The New Building Of The L332n, Is To Be Completed As Part Of This Measure Up To The Transfer Structure Bw 6 At Station 8+995 (Stations Of The L332n) And Put Into Operation According To The Measure. The Walking/ Bike Path Running South Of The L332n Begins On The Already Finally Produced Walking/ Bike Path Along The Retaining Wall 11 (Approx. Station 8+950). The Provisional Branch Must Be Recreated. The Section Approx. Between The Stations 8+575 And 8+950 (Stations Of The L332n) Was Produced In The Leading Construction Phase. The Walking/ Bike Path/ Fire Brigade Access Running North Of The L332n Ends In The Final Expansion State Up To Station 8+965 And Is Continued Up To The Bw6 On The Pastors. The Provisional Path Must Be Recreated According To The Measure. The Walking/ Cycle Path Connection To Wielandstrasse Takes Place South Of The Building 6 (Transfer Structure). The New Wielandstraße And On The Schindkaule Are Continuously Equipped With Street Lighting. The Associated Civil Engineering Performance (Grave Production And Production Of The Mast Foundations) Are Part Of The Present Construction Measure. For Later Supplies, An Empty Pipe Route Of Approx. 35 M In Length Is Prepared.
Contact Information
Address
Albertstraße 22
Contact No.
+492261890
Email
RNL-RB-Vergabeservice@strassen.nrw.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 92226625
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.